Similar Projects
Tom Corley Place/Townhome Subdivision
New Construction, Infrastructure
Conception
$12,825,000 CJ est. value
Lexington, SC 29072

US 378 Over Twelve Mile Creek
Demolition, New Construction, Infrastructure
Conception
$11,785,000 CJ est. value
Lexington, SC 29072

Batesburg-Leesville Boarding Facility
New Construction, Infrastructure - 4,000 SF
Design
$600,000 CJ est. value
Leesville, SC 29070

Lexington County Boardwalk
Infrastructure
Design
Leesville, SC 29070

FM-MNS Road Maintenance Project
Infrastructure
Bidding
$250,000 CJ est. value
Columbia, SC 29212

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Irmo High School East Wing Replacement - District 5 of Lexington and Richland Counties
New Construction, Infrastructure
Post-Bid
$45,000,000 CJ est. value
Columbia, SC 29212

Saluda Gardens Water System Improvements Project - Division I
Infrastructure
Results
West Columbia, SC

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Murphy Express #8643 / Springdale
Demolition, New Construction, Infrastructure - 2,824 SF
Construction
$1,500,000 CJ est. value
Cayce, SC 29033

Chick-fil-A Supply Distribution Center - Saxe Gotha Industrial Park / West Columbia
New Construction, Infrastructure - 245,000 SF
Construction
$80,000,000 CJ est. value
West Columbia, SC 29172

University of South Carolina Health Sciences Campus
New Construction, Infrastructure - 292,000 SF
Pending Verification
$300,000,000 CJ est. value
Columbia, SC 29209

Cardiac Catheterization Lab - Lexington Medical Center
Addition, Demolition, Infrastructure
Pending Verification
$2,902,219 CJ est. value
West Columbia, SC 29169

US 21 over Congaree Creek
Demolition, New Construction, Infrastructure
Conception
$6,750,000 CJ est. value
Cayce, SC 29033

803 Industrial Park / Gateway Building Two
New Construction, Infrastructure - 408,240 SF
Design
$220,000,000 CJ est. value
West Columbia, SC 29170

Last Updated 06/22/2023 01:11 PM
Project Title

Twelve/Fourteen Mile Creek 30'' Force Main - Division I (Cromer Road Pump Station to I-20 Lagoon Pump Station)

Physical Address View project details and contacts
City, State (County) Lexington, SC 29072   (Lexington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,729,239 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 21, 2023, the project has been awarded. A timeline for construction has not been confirmed. Bids are invited upon the several items and quantities of work as follows: Installation of approximately 3730 LF of 30-inch DIP, 65 LF of 24-inch, and 30 LF of 12- inch sewer force mains via open cut, 2 air release valve, 4 - 24" and 2 - 30" plug valves, fittings, and all necessary appurtenances as specified and depicted in the Contract Documents No bid shall be considered unless the bidder is legally qualified under the provisions of the South Carolina Contractor's Licensing Law and has a classification of General Contractor-Public Utilities and a subclassification of Water and Sewer Lines with the appropriate License Group Limitation for the Bid amount. No bidder may withdraw his Bid within 90 consecutive days after the actual date of opening. A certified check or bank draft payable to the order of the OWNER, negotiable U. S. Government Bonds (at par value), or a satisfactory Bid Bond executed by the Bidder and an acceptable Surety in an amount equal to five percent (5%) of the total Bid shall be submitted with each Bid. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project as applicable. The Contractor shall ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. OWNER reserves the right to reject any and/or all Bids or to waive any informalities in the Bidding. Bids may be held by the OWNER for a period not to exceed ninety (90) days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents