Similar Projects
Z2DA--Correct HVAC Deficiencies
Infrastructure, Alteration
Design
$1,000,000 to $5,000,000 est. value
Hampton, VA

HEPA Certification and Replacement
Term Contract
Design
Hampton, VA 23667

Replace Hastings Hall Roof, HVAC, and Demolish Greenhouse
Alteration
Bidding
Hampton, VA 23666

Boiler Maintenance and Repair
Term Contract
Bidding

HVAC and Mechanical Products
Term Contract
Post-Bid

Air Purification Systems
Post-Bid
Chatham, Pound, Victoria, VA 23936

Heating, Ventilation, Air Conditioning, Refrigeration, and Plumbing Maintenance Services
Results
Hampton, VA

HVAC PM and Repair Services
Term Contract, Alteration
Results
Hamilton, Hampton, VA

Armstrong SF665DW Heater Replacement Parts
Post-Bid

HVAC Mechanical Preventative Maintenance and On-Call Repair Service Division 5
Term Contract
Results
Chesapeake, Courtland, Emporia, Gloucester, Hampton, Melfa, Norfolk, Waverly, Williamsburg, VA 23320

Repair HVAC and Fire Alarm System at Facility 661
Post-Bid
$1,000,000 to $5,000,000 est. value
Hampton, VA 23665

Replace Roof Top Units at Peninsula Workforce Development Center (PWDC) Rooftop Units Replacement Thomas Nelson Community College
Alteration
Results
Hampton, VA 23666

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

A.O. Smith LP Gas-Hot Water Heater 100 Gallon-Proprietary
Alteration
Results

J041--HVAC Preventative Maintenance and repairs
Term Contract
Post-Bid
Hampton, VA 23667

Reported 03/21/2022 03:15 AM
Project Title

HRBT Admin HVAC Replacement

Physical Address View project details and contacts
City, State (County) Hampton, VA 23663   (Hampton City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Replacement of an Existing Central Station Air Handling Unit Hvac System Serving The Hrbt Administration Office Building. The New System Will Include, But Is Not Limited To The Removal Of The Existing Ahu, Circulator Pump And Evaporative Cooler And Installation Of New Outdoor Condensing Unit And Related Mechanical Connections, Controls And Accessories.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents