Similar Projects
Locust Street Solar
New Construction, Infrastructure
Conception
$500,000 est. value
Freetown, MA

Washington Street Mixed-Used Development
New Construction, Infrastructure - 22,356 SF
Conception
$30,000,000 CJ est. value
Easton, MA 02334

Walker Street/Mixed Use - 175 South Walker Street, LLC
New Construction, Infrastructure - 5,400 SF
Design
$3,000,000 CJ est. value
Taunton, MA 02780

Newport Avenue Mixed-Use Development
New Construction, Infrastructure - 14,800 SF
Design
$128,000,000 CJ est. value
Attleboro, MA 02703

RFQ Design - Designer Services for Master Plan for Mansfield Green
Infrastructure
Post-Bid
$500,000 CJ est. value
Mansfield, MA 02048

New Bedford State Pier - Use / Development
Infrastructure
Post-Bid
$70,000,000 CJ est. value
New Bedford, MA 02740

Wastewater Treatment Plant Upgrades
Renovation
Results
$750,000 est. value
Easton, MA 02356

2022 Sewer Manhole Rehabilitation
Infrastructure
Results
$396,565 CJ est. value
North Attleboro, MA 02760

RFP D/B - Corridor Improvements on Route 79 and Davol Street
Infrastructure
Construction
$114,649,507 CJ est. value
Fall River, MA 02720

The Preserve at Dartmouth
New Construction, Infrastructure
Construction
$80,000,000 CJ est. value
N Dartmouth, MA 02747

Gracey Estates Subdivision
New Construction, Infrastructure
Pending Verification
$5,500,000 CJ est. value
Taunton, MA 02780

Taco Bell / Attleboro
New Construction, Infrastructure
Pending Verification
$400,000 CJ est. value
Attleboro, MA 02703

New Turf Field at High School, North Attleboro
Infrastructure
Conception
$9,500,000 CJ est. value
North Attleboro, MA 02760

Winthrop Street Auto Repair Shop
New Construction, Infrastructure
Design
$1,100,000 CJ est. value
Taunton, MA 02780

Library Renovation and/or Expansion - Town of Swansea
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$16,000,000 CJ est. value
Swansea, MA 02777

Last Updated 01/08/2024 12:05 PM
Project Title

RFP Contractor - Raynham Center Water District PFAS Water Treatment Plants Prequalification - GC

Physical Address View project details and contacts
City, State (County) Raynham, MA 02767   (Bristol County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected March 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This Request for Qualifications (RFQ) is the first step of a two-phase bidding process as required by M.G.L. Chapter 149, Section 44D 1/2 and Section 44D 3/4 for building contracts estimated to cost $10 million or more. The estimated construction cost of the project is $20M. The Raynham Center Water District's Prequalification Committee will consist of representatives from the Water District and the project's consulting engineering firm of Tighe & Bond. The committee will evaluate the Statement of Qualifications using the criteria contained in the RFQ and prequalify those General Contractors and Subcontractors meeting a minimum RFQ criterion score. Following prequalification, the Raynham Center Water District will invite the prequalified respondents to submit General Bids and Filed Sub Bids for the PFAS Water Treatment Plants Project DWSRF-11390. General Bidders must be DCAMM certified in "Sewage and Water Treatment Plants". Filed Sub-Bidders must be DCAMM certified for the category of work for which they are submitting a bid. The work consists of construction of a new 2.14 MGD PFAS water treatment plant at the John P. Lynn site in a 9,900 s.f. pre-engineered metal building. The work includes demolition of the generator, two aerated water pumps and associated piping, chemical feed system, and blower and aeration tower in the existing aeration building at the John P. Lynn site. The work also consists of construction of a new 1.22 MGD water treatment plant at the Lake Nip site in a 3,000 s.f. preengineered metal building and demolition of the existing GAC treatment buildings at the Lake Nip Site. Both buildings will contain filtration equipment, process piping, storage tanks, pumping equipment, electrical and chemical feed systems. The work includes, but is not limited to, excavation and backfill, site utilities, concrete and masonry building construction, process piping, chemical feed systems, HVAC, plumbing, electrical systems, and instrumentation and controls. Construction is expected to begin in the Spring/Summer of 2024. The project shall be substantially completed within 630 calendar days following the Notice to Proceed. Filed sub-bid categories include: Masonry, Miscellaneous Metals, Waterproofing and Sealants, Painting, Fire Protection, Plumbing, HVAC, and Electrical. The successful respondent must be able to obtain bonding for the full construction cost. Disadvantage Business Enterprise (DBE) goals may be applicable on this project. The minimum goals for this project are 4.2% D/MBE participation and 4.5% D/WBE participation by certified DBE firms. Further public notice information regarding the specifics of this project and the prequalification evaluation criteria and selection process is included in the RFQ.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents