Similar Projects
West Howard St Br (Tpk Bond)
Demolition, New Construction, Infrastructure
Design
$1,600,000 CJ est. value
Welch, WV 24801

West Howard St Br (Tpk Bond)
Demolition, New Construction, Infrastructure
Design
$1,600,000 CJ est. value
Welch, WV 24801

Guardrail - D10 Districtwide GR End Treatments
Infrastructure
Bidding
$800,000 CJ est. value
Coalwood, WV 24828

Kimball - Northfork
Infrastructure
Bidding
$800,000 CJ est. value
Kimball, WV 24853

Pavement Markings Roadway Striping District Wide
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Coalwood, WV 24828

Dollar General / Paynesville
New Construction, Infrastructure - 10,640 SF
Post-Bid
$2,000,000 CJ est. value
Paynesville, WV 24873

Dollar General / Paynesville
New Construction, Infrastructure - 10,640 SF
Post-Bid
$2,000,000 CJ est. value
Paynesville, WV 24873

Kimball Slab Bridge
New Construction, Infrastructure
Results
WV

Bartley Bottom Bridge
New Construction, Infrastructure
Results
WV

Big Four - Kimball Rd
Infrastructure
Design
$900,000 CJ est. value
Welch, WV 24801

Mohawk Arch
Infrastructure
Results
WV

Mohawk Arch
New Construction, Infrastructure
Results
WV

Big Creek Arch
New Construction, Infrastructure
Results
WV

Superior Bridge
New Construction, Infrastructure
Results
WV

Highway Pollinator Mitigation Site Development and Maintenance
Term Contract, Infrastructure
Results

Last Updated 01/30/2023 11:31 PM
Project Title

Clear Fork Arch No 3

Physical Address View project details and contacts
City, State (County) Northfork, WV 24868   (McDowell County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Project Number : STP0006052D Type of Work : Replace Bridge As of January 31, 2023, the project is in Final Planning status. The funding obligation date for the construction is October 28, 2022. WVDOT - Clear Fork Arch No 3 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents