Similar Projects
Greeley Park Improvements - City of Nashua
New Construction, Infrastructure
Conception
$500,000 est. value
Nashua, NH 03064

Main Dunstable Road/Buckmeadow Road Improvements - City of Nashua
Infrastructure, Alteration
Conception
$800,000 est. value
Nashua, NH 03062

Thomas More College of Liberal Arts Campus Improvements
Renovation
Design
Merrimack, NH 03054

Merrimack 43759
Renovation
Bidding
$1,063,878 est. value
Merrimack, NH

Removal of the Exit 10 NB Off and SB on Ramp Tolls Off the F.E. Everett Turnpike
Infrastructure
Bidding
Merrimack, NH

2021 Municipal Road Reconstruction
Infrastructure
Post-Bid
Milford, NH

Acquisition and Development of Pearl Street Parking Lot
Infrastructure
Post-Bid
Manchester, NH 03104

2021 Paving Program - Arterial and Collector Roadway
Results
Nashua, NH

2021 Paving Program-Residential Roadways
Results
Nashua, NH

Litchfield PFOA Water Service Improvements
Construction
Litchfield, NH 03052

East Hollis Street Improvements - Main Street to Court Street Corridor - City of Nashua
Alteration
Conception
$783,936 est. value
Nashua, NH 03060

Acquisition and Development of Hartnett Parking Lot
Infrastructure
Post-Bid
Manchester, NH

Roadway Resurfacing
Results
Less than $2,521,117 est. value

East Hollis Street Intersection Improvements - City of Nashua
Infrastructure
Conception
Nashua, NH 03060

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Reported 06/15/2022 09:24 AM
Project Title

Walnut Street /Chestnut Street /Central Street Oval Improvements - City of Nashua

Physical Address View project details and contacts
City, State (County) Nashua, NH   (Hillsborough County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $501,422
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project aims to reconfigure a portion of the downtown area to improve traffic flow, reduce speeds and improve pedestrian access. Proposed work includes one-way street pairs of Factory St and West Pearl St and revising traffic flows and/or directions on portions of W Hollis St, Central St, Chestnut St School St and High St. This request is for design cost only. This project is in included in the City of Nashua - Planning FY 2023 - 2028 Capital Improvement Plan (CIP). As of June 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents