Similar Projects
Sky View High School Pool AHU and Mountain Crest High School Boiler Replacement Project
Bidding
Hyrum, Smithfield, UT 84335

Boiler
Bidding
Cedar City, UT

Hydraulic Pumps, Cylinders, Motors and Related Services
Term Contract
Post-Bid
Salt Lake City, UT

Millville Elementary School Chiller Project
Post-Bid
Millville, UT 84326

J--NIIP B2.9L Unit 4 Motor Rewind and Reconconditioni
Results
Salt Lake City, UT 84044

Salt Lake City (SLC) Cooling Tower Mechanical Separator
Results
$25,000 to $50,000 est. value
Salt Lake City, UT

DFCM Construction - Pre Qualified Mechanical - DOH USL MOD 1 Autoclave Replacement
Bidding
$125,000 est. value
Taylorsville, UT 84129

Design-Build Mechanical Upgrade at DISA
Post-Bid
$10,000,000 to $25,000,000 est. value
UT

Pleasant Grove High School Boiler Replacement
Results
Pleasant Grove, UT 84062

Aquatic Center Boiler Replacement Project
Post-Bid
Roy, UT 84067

University of Utah High Temperature Water Converter Building 25
Term Contract
Results
$20,000 to $25,000 est. value
Salt Lake City, UT 84112

Annual Contract for Plumbing/Mechanical Work
Term Contract
Post-Bid
Salt Lake City, UT 84115

Annual Contract for Boiler Repairs
Term Contract
Results
Salt Lake City, UT 84115

Mckinley Elementary School Boiler Replacement Project
Post-Bid
Tremonton, UT 84337

Construction: Westbrook Elementary, Boiler Replacement
Results
Taylorsville, UT 84129

Last Updated 01/18/2021 04:32 PM
Project Title

Roy High Boiler Replacement

Physical Address View project details and contacts
City, State (County) Roy, UT 84067   (Weber County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000 to $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes, but is not limited to mechanical work involving the demolition of the existing steam boiler, heat exchangers, steam and condensate piping, heating hot water piping, pumps, domestic water heating equipment, tanks and controls and the installation of new Hurst Series 40 boiler, heating hot water pumps and piping, storage tanks and appurtenances. The project also includes, but is not limited to electrical work involving the demolition of the existing electrical systems serving the boiler, pumps, mechanical equipment etc. and the installation of new conduit and conductors, variable frequency drives and disconnects for serving the new boilers, and pumps.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boiler Feedwater Equipment, Boiler Feedwater Pumps.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents