Similar Projects
Last Updated | 02/05/2021 11:56 PM |
Project Title | Horizontal Curve and Stop Sign Removal and Replacement on Various Routes |
Physical Address | View project details and contacts |
City, State (County) | MI (Emmet County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Item No : 2102 039 Contract ID : 24000-210382 Control Sec : HSIP 24000 Job No : 210382A Federal No : 21A0078 Horizontal curve and stop sign removal and replacement on various routes, Emmet County. Section: 1 0010 Mobilization, Max $20,300.00 1500001 1.000 LSUM 0020 Post, Steel, 3 lb 8100371 7,728.000 Ft 0030 Sign, Type IIIA 8100404 684.000 Sft 0040 Sign, Type IIIB 8100405 2,438.000 Sft 0050 Reflective Panel for Permanent Sign Support, 3 foot 8100613 228.000 Ea 0060 Reflective Panel for Permanent Sign Support, 6 foot 8100616 496.000 Ea 0070 _ Sign, Type III, Rem, Modified 8107050 209.000 Ea 0080 _ Minor Traf Devices, Modified 8127051 1.000 LSUM 0090 Flsh Beacon, Solar Power 8200071 8.000 Ea |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |