Similar Projects
Locust Street Solar
New Construction, Infrastructure
Conception
$500,000 est. value
Freetown, MA

Washington Street Mixed-Used Development
New Construction, Infrastructure - 22,356 SF
Conception
$30,000,000 CJ est. value
Easton, MA 02334

Walker Street/Mixed Use - 175 South Walker Street, LLC
New Construction, Infrastructure - 5,400 SF
Design
$3,000,000 CJ est. value
Taunton, MA 02780

Paskamansett Office Park - Amendment
New Construction
Design
Dartmouth, MA 02747

NorthStar Learning Center / New Bedford
New Construction, Infrastructure - 18,000 SF
Bidding
$8,600,000 CJ est. value
New Bedford, MA 02744

Acushnet Headquarters Atrium & Entries Renovation
Renovation - 15,000 SF
Post-Bid
Fairhaven, MA 02719

East Campus Dorm Demolition
Demolition, Infrastructure
Post-Bid
$14,000,000 est. value
Dartmouth, MA 02747

DPW Services for Excavation Services
Term Contract, Infrastructure
Results
Mansfield, MA

Excavation Services to Remove and Properly Dispose
Infrastructure
Results
Less than $140,000 est. value
Easton, MA 02375

RFP D/B - Corridor Improvements on Route 79 and Davol Street
Infrastructure
Construction
$114,649,507 CJ est. value
Fall River, MA 02720

Gracey Estates Subdivision
New Construction, Infrastructure
Pending Verification
$5,500,000 CJ est. value
Taunton, MA 02780

Taco Bell / Attleboro
New Construction, Infrastructure
Pending Verification
$400,000 CJ est. value
Attleboro, MA 02703

New Turf Field at High School, North Attleboro
Infrastructure
Conception
$9,500,000 CJ est. value
North Attleboro, MA 02760

East Washington Street Redevelopment
Renovation - 10,771 SF
Design
North Attleborough, MA 02760

RFQ Design - Designer Services for Master Plan for Mansfield Green
Infrastructure
Post-Bid
$500,000 CJ est. value
Mansfield, MA 02048

Last Updated 06/06/2023 01:35 PM
Project Title

Turnpike Street Warehouse and Office

Physical Address View project details and contacts
City, State (County) South Easton, MA 02375   (Bristol County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will be at 530 & 560 Turnpike Street. A building permit was issued from the Town of Easton on May 16, 2023. As of June 6, 2023, construction is likely underway. The selected contractor was not announced. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

101,200 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents