Similar Projects
RFQ Contractor - Re-Roofing Projects
Renovation
Design
$700,000 CJ est. value
Falls Church, VA 22046

RFQ Contractors - Roofing On-Demand Construction Program
Term Contract
Sub-Bidding
Charlottesville, VA 22902

Oakridge Central Administration Services Roof Replacement
Renovation - 19,091 SF
Sub-Bidding
$330,000 CJ est. value
Bon Air, VA 23235

Gutter Replacement at Building B-45 at Defense Supply Center-Richmond
Alteration
Post-Bid
Richmond, VA

Water Treatment Plant Roof Replacement
Alteration
Post-Bid
$600,000 est. value
Danville, VA 24541

Roof Replacement Project Westbriar Elementary School
Alteration
Results
$159,324 est. value
Vienna, VA 22182

Roof Repair and Replacement
Alteration
Results
Buckingham, VA

NOS/NGS Roof and Gutter Replacement; Woodford, VA
Renovation
Sub-Bidding
$25,000 CJ est. value
Woodford, VA 22580

Roof Rehabilation Project at Colonial Heights High School
Alteration
Post-Bid
Colonial Heights, VA 23834

Goodview Elementary School Roof Recovering and HVAC System Replacement
Alteration
Results
Goodview, VA 24095

Tangier Combined School Roof Replacement Project
Renovation
Sub-Bidding
$200,000 CJ est. value
Tangier, VA 23440

Summer 2022 Roofing Projects - Walton Middle School Phase Two
Alteration
Post-Bid
$500,000 to $3,000,000 est. value
Charlottesville, VA 22903

Forest Middle School Roof Recovering and HVAC System Replacement
Alteration
Results
Forest, VA 24551

Replace Gutters - Building 467
Term Contract
Post-Bid
Less than $25,000 est. value
Hampton, VA 23665

Thomas Jefferson Elementary School Roof Recovering and HVAC System Replacement
Alteration
Results
Forest, VA 24551

Last Updated 05/15/2023 03:12 PM
Project Title

Roof Replacement West Piedmont Building

Physical Address View project details and contacts
City, State (County) Martinsville, VA 24112   (Martinsville City County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The successful bidder will be required to obtain all necessary liability insurances to hold the City of Martinsville harmless and will be required to furnish all certificates of such insurance. All materials used and work done shall be subject to the inspection, test and approval of the Director of Public Works of the City of Martinsville, Virginia, or his duly authorized representatives. The successful bidder shall enter into a written contract within ten (10) days of the award of the contract and said contract shall embody all of the terms, conditions, and provisions of the notice to bidders, specifications and proposals. Vendor to furnish all material, labor and equipment to perform the conversion of the main building of the wastewater treatment plant. The City reserves the right to accept or reject any and all bids, to purchase any part of the whole of items bid upon, to waive any informalities, and to award this contract as determined to be the most advantageous to the City. The City reserves the right to terminate this contract with a 30-day written notice if service and/or parts become unsatisfactory. Response received after the date and closing will be considered non-responsive and will not be opened. Bids will not be accepted via fax machine or internet e-mail. Proposer to furnish labor, equipment, and supervision to replace the roof of the West Piedmont Business Development Center. Please see the attached drawing to show square footage and current layout. City is open to going back with the current style of roofing (rubberized flat) or any alternative roofing methods There are no as built plans but City believes the current deck consists of metal and then covered with asphalt & gravel. Before it was last covered with the current material there was a foam board that was installed. There are some structures on the roof we are ok removing. There is an older a/c unit that can be removed along with a satellite dish and some of the larger metal framing that held an old chiller.

Details

12,816 SF.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents