Similar Projects
Poe Lock Rehibition Ship Arrestors Sault Ste Marie, MI
Renovation
Design
$10,000,000 to $25,000,000 est. value
Sault Sainte Marie, MI

Milham Park Dam Removal
Bidding
Kalamazoo, MI

MacArthur Lock Tainter Valve Machinery Replacement
Post-Bid
$5,000,000 to $10,000,000 est. value
Sault Sainte Marie, MI 49783

Sault Visitor Center Lock Operator Exhibit
Post-Bid
Sault Sainte Marie, MI

Ford Fieldhouse Tunnel Repairs
Results
Grand Rapids, MI

Korpela to Wakefield Stateline Grade Extension Culvert and Bridge Replacement
Results
MI

Gull Lake Dam Improvements
Renovation
Post-Bid
Grand Rapids, MI

Union Street Dam Fish Pass
Results
Traverse City, MI 49684

Flat Rock Dam Boom Installation
Post-Bid
Brighton, MI

2020 Chappel Dam Improvements
Results
Gladwin, MI 48624

New Lock at the Soo Chamber Construction
Post-Bid
$500,000,000 to $800,000,000 est. value
Sault Sainte Marie, MI 49783

Eden Dam Modifications and Stabilization Measures
Results
MI

Project Labor Agreement for Construction of New Soo Lock Chamber
Post-Bid
$500,000,000 est. value
Sault Sainte Marie, MI 49783

Perrin Dam Improvements
Results
Marshall, MI

High Temperature Hot Water Replacement to Hill House
Post-Bid
Rochester, MI 48316

Reported 06/18/2020 12:00 AM
Project Title

Upstream Approach Wall Construction for the Soo Lock Complex, Sault Ste. Marie, MI.

Physical Address View project details and contacts
City, State (County) Sault Sainte Marie, MI   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $100,000,000 to $250,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: The Detroit District of the US Army Corps of Engineers intends to issue a Request for Proposal (RFP), W911XK20R0003, for a firm-fixed price construction contract to construct the new Upstream Approach Walls for the Soo Lock Complex, Sault Ste. Marie, MI. No solicitation document exists at this time. The scope of work will be attached with the solicitation announcement. The solicitation is expected to be released on or around 26 February 2020. The inteded start date for this project is approximately 30 days after contract award.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents