Similar Projects
125th Avenue, STH 124 to STH 178, LRIP TRID
Infrastructure
Bidding
Chippewa Falls, WI 54729

Bloomer - New Auburn, 83rd Street to CTH Q
New Construction, Infrastructure
Bidding
WI

2021 LRIP Road Improvements
Post-Bid
New Auburn, WI 54757

Lift to Road
Infrastructure
Post-Bid
Bloomer, WI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Culvert Installation
Infrastructure
Post-Bid
WI 54724

ATV / UTV Trail Construction
New Construction
Results
Lake Wissota, WI 54729

Road Work
Infrastructure
Post-Bid
Bloomer, WI 54724

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Crack Sealing
Infrastructure
Post-Bid
Bloomer, WI 54724

Anson 105th Avenue Resurfacing
Results
Jim Falls, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

C. Chippewa Falls, Seymour Cray SR Blvd., CTH I Intersection
Results
Chippewa Falls, Seymour, WI

City Wide Valve And Hydrant Replacement
Alteration
Post-Bid
Eau Claire, WI

Last Updated 02/10/2022 01:23 PM
Project Title

2022-2023 Street Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) Bloomer, WI   (Chippewa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work on this contract consists of 46,421 SY pavement removal, 7,405 LF 8-inch DIP water main, 2,583 LF 12-inch DIP water main, 7,457 LF 8-inch PVC sanitary sewer, 1,040 LF 10-inch PVC sanitary sewer, 2,050 LF PVC 12-inch sanitary sewer, 271 LF 4-inch force main, 8,001 LF HDPE storm sewer ranging from 10-36 inches, 267 LF RCP storm sewer ranging from 12-18 inches, 7,590 CY common excavation, and 9,322 Tons hot mix asphalt.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents