Similar Projects
6th Avenue and 28th Street Pulverizing & Relay, Limestone Base Replacement
Post-Bid
$64,000 est. value
Camp Douglas, WI 54618

2020 Freedom Road Paving
Post-Bid
North Freedom, WI 53951

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Street Resurfacing - Walnut Road And Lakeshore Way
Results
Twin Lakes, WI 53181

Resurface & Expand Privately Owned Vehicle Parking - General
Results
$340,000 est. value
Eau Claire, WI 54702

Concrete Alley Pavement
New Construction
Results
Milwaukee, WI 53202

Paving Work
New Construction
Results
Milwaukee, WI 53202

Bioswale
New Construction
Results
Milwaukee, WI

2020 Asphalt Pavement Repair
Results
Less than $69,000 est. value
Cedarburg, WI 53012

Stewart Avenue Resurfacing
Results
Wausau, WI 54403

Wisconsin Street Reconditioning
Results
New Lisbon, WI 53950

Road Repairs - Entrance Lot C to Sunset Campgrounds
Results
Less than $461,000 est. value
Kansasville, WI 53139

2020 Concrete Pavement Maintenance and Repairs
Results
Less than $78,000 est. value
Milton, WI 53563

CTH 'G' Street Construction
Results
Egg Harbor, WI 54209

Last Updated 07/21/2021 04:22 PM
Project Title

2021 Street Paving Program

Physical Address View project details and contacts
City, State (County) WI 54915   (Calumet County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work for the project known as 2021 Street Paving Program is described as follows: Construction of streets including, but not limited to, providing the following:, hot mix asphalt pavement, mountable concrete curb and gutter, concrete sidewalk, concrete driveway aprons, removal of asphalt, preparation of foundation, common excavation, dense graded base aggregate, geogrid, pavement marking, erosion control, site restoration, traffic control, and storm sewer (alternate), for all or portions of the following streets: Noe Rd., Sweet Pea Dr., Sweet Clover Dr., Easter Lily Dr., Sweet William Dr., Phlox Dr., Geranium Dr., African Violet Dr., Blue Bonnet Dr., Petunia Ct., Daffodil Dr., Hoelzel Way, Rosella Dr., Dusty Dr., Varsity Ln., Mulholland Ln., Touchdown Dr., Schreiber Ln., Jones Way, Sweetgrass Tr., Wildflower Tr., Ryford St., Zach Dr., and Connor Cir

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents