Similar Projects
Blair Street, South - 11128 - City of Madison
Infrastructure
Conception
$1,627,000 CJ est. value
Madison, WI 53703

Senior Center Building Improvements - 12434 - City of Madison
Renovation, Infrastructure
Conception
$330,000 CJ est. value
Madison, WI 53703

Diventures / Sun Prairie
New Construction, Infrastructure - 10,500 SF
Design
$2,500,000 CJ est. value
Sun Prairie, WI 53590

Monona Drive Mixed-Use Development
Demolition, New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Madison, WI 53716

Cannonball Path Phase 6
Infrastructure
Bidding
$730,000 CJ est. value
Madison, WI 53711

Parkside Drive Sanitary Sewer Replacement
Infrastructure
Bidding
$400,000 CJ est. value
Madison, WI 53704

Phased Modernization of the USGS National Wildlife Health Center in Madison - US Geological Survey (USGS) - Western Ecological Research Center
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Madison, WI 53711

Crowley Station Crowley Concrete Access Walk
Infrastructure
Post-Bid
$450,000 CJ est. value
Madison, WI 53703

Pleasant View Golf Course Improvements
Infrastructure
Results
$1,385,300 CJ est. value
Middleton, WI 53562

Bikeways 2022
Infrastructure
Results
$644,117 CJ est. value
Madison, WI 53715

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Headquarters Roof Replacement
Renovation, Infrastructure
Construction
$2,282,538 CJ est. value
Madison, WI 53703

Oliv Madison
Demolition, New Construction, Infrastructure - 23,229 SF
Pending Verification
$100,000,000 CJ est. value
Madison, WI 53703

University Avenue Duplexes
Demolition, New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Middleton, WI 53562

Park Street, South / Olin To Railroad - 11133 - City of Madison
Infrastructure
Conception
$458,000 CJ est. value
Madison, WI 53715

Last Updated 01/04/2024 07:17 AM
Project Title

Unit Well 19 Treatment System Addition

Physical Address View project details and contacts
City, State (County) Madison, WI 53705   (Dane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $7,344,825 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Unit Well 19 Treatment System Addition 10448-86-140, MADWU 167818, C22051-10 Project Manager: Kelly Miess Phone: 261-9640 Email: kmiess@madisonwater.org Estimated Start Date: 01/02/2024 If you have any questions, please call Alane Boutelle at (608) 267-1197, or John Fahrney at (608) 266-9091.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents