Similar Projects
Placing Various Widths of Modified Urethane and Thermoplastic Pavement Marking Lines, Letters and Symbols
Infrastructure
Bidding
$200,000 est. value

Application of an A-1 or A-2 Seal Coat
Infrastructure
Bidding
$100,000 est. value
Oregon, IL

Central Division - Asphalt Paving Maintenance
Post-Bid

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

Crack Sealing
Results
IL

2021 Multi Park Paving Improvements
Post-Bid
Oregon, IL 61061

Resurface Meridian Road from IL 72 to IL 64
Results
IL

Installation of Oversized Chevrons along Interchange Ramp Curves at Various Locations
Infrastructure
Post-Bid

Byron Streets 2021-Slurry Seal
Results
Less than $69,982 est. value
Byron, IL

2022 County Pipe Culverts
Infrastructure
Post-Bid
Ashton, Chana, Creston, Forreston, Kings, Leaf River, Lindenwood, Monroe Center, Oregon, Polo, Rochelle, IL

Salt Shed Paving
Results
Less than $49,452 est. value
IL

2022 County Pipe Culverts
Infrastructure
Post-Bid
Oregon, IL

Centerline and Edgeline Striping
Results
IL

Mill Road Shared-Use Path Extension
Infrastructure
Post-Bid
Byron, IL 61010

Last Updated 04/28/2022 11:19 PM
Project Title

Lowell Park Road Extensions

Physical Address View project details and contacts
City, State (County) IL   (Ogle County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of constructing one precast concrete culvert and constructing cast-in-place extensions at 10 other locations noted along with excavation along the culvert flow line to accommodate the new termination points of the culvert extensions. Construction of roadway asphalt patches, placing aggregate shoulders, slope grading, ditch shaping, final landscaping restoration, and erosion control will be completed by Ogle County day labor forces.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents