Similar Projects
Nelson Property Group Residential
New Construction - 7,400 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Rock Hill, SC

Legal Remedy Brewing Mixed Use
New Construction, Infrastructure - 9,800 SF
Conception
$4,000,000 CJ est. value
Rock Hill, SC 29732

The Reserve At Rock Hill Independent Living Facility
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Rock Hill, SC 29730

Firetower Logistics @ 77
New Construction, Infrastructure - 1,000,000 SF
Design
$30,000,000 CJ est. value
Rock Hill, SC 29730

Intersection Improvement - SC 161/S-30 (York Co)
Infrastructure
Bidding
$6,821,718 CJ est. value
York, SC 29745

Intersection Improvement - SC 161/S-30 (York Co)
Infrastructure
Bidding
$6,821,718 CJ est. value
York, SC 29745

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Rehabilitation
Infrastructure
Results
SC

Devinney Road Paving Project
Infrastructure
Results
$440,000 est. value
York, SC 29745

Rock Hill Herald Redevelopment
Demolition, New Construction, Infrastructure - 26,000 SF
Pending Verification
$355,000,000 CJ est. value
Rock Hill, SC 29730

Rock Hill Herald Redevelopment
Demolition, New Construction, Infrastructure - 26,000 SF
Pending Verification
$355,000,000 CJ est. value
Rock Hill, SC 29730

Nichols Store /Rock Hill
New Construction, Infrastructure - 11,750 SF
Conception
$3,000,000 CJ est. value
Rock Hill, SC 29730

Three Points on Saluda
New Construction, Infrastructure - 45,000 SF
Design
$12,000,000 CJ est. value
Rock Hill, SC 29730

Rock Hill Commerce Center Phase II
New Construction, Infrastructure - 250,576 SF
Bidding
$17,540,000 CJ est. value
Rock Hill, SC 29730

Last Updated 10/05/2022 05:32 PM
Project Title

Catawba Bend Preserve Natural Trail Construction

Physical Address View project details and contacts
City, State (County) Rock Hill, SC 29730   (York County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of Oct 5 the project is currently under negotiation.A timeline for award has not yet been established yet For Catawba Bend Preserve Natural Trail Construction Additional Documents available from: N/A Questions Deadline: No later than 5:00 p.m. Tuesday, July 13, 2022 Email: procurement@yorkcountygov.com Each Proposal must be accompanied by a cashier's check or Bid Bond made payable to the OWNER in an amount not less than five percent (5%) of the total amount of the Proposal if the total amount of the bid exceeds $30,000. Generally, the bid security of all Offerors, will be returned within ten (10) days after the OWNER and the accepted Offeror have executed the written Contract and the accepted Offeror has filed acceptable Performance and Indemnity and Payment Bonds. Upon request and no earlier than thirty (30) days after the formal opening of proposals, the County will return the bid security of any Offeror. Simultaneously with his delivery of the executed Contract to the OWNER, an Offeror to whom a Contract has been awarded must deliver to the OWNER executed Performance and Indemnity and Payment Bonds on the prescribed forms each in an amount equal to one hundred percent (100%) of the total amount of the Contract Amount, as security for the faithful performance of the Contract and for the payment of all persons performing labor or furnishing materials in connection therewith. The Performance and Indemnity and Payment Bonds shall have as the surety thereon only such surety company or companies as are authorized to write bonds of such character and amount under the laws of the State of South Carolina and with a resident agent in the County in which the project is located. The Attorney-in-Fact or other officer who signs the Performance and Indemnity and Payment Bonds for a surety company must file with such bonds a certified copy of his Power-of-Attorney authorizing him to do so. The Performance and Indemnity and Payment Bonds shall remain in force for one (1) year from the date of final payment of the Work as a protection to the OWNER against losses resulting from latent defects in materials or improper performance of work under the Contract, which may appear or be discovered during that period The Catawba Bend Preserve Master Plan identifies 25 miles of natural trails further described as the Loblolly Trail in the Council approved Master Plan Report (Master Plan attached). Phase 1 of construction includes 8 miles of the Loblolly Trail system. This RFP is for the first 4 miles; approximately 21,120 linear feet of natural trails for pedestrian hiking. 4.2 The Catawba Bend Preserve is in a conservation easement and trail layout and construction should minimize tree removal, follow natural topography and avoid protected streams and wetlands. The trail width will vary, minimum width is 6 feet wide. The trail width may increase based on site conditions (i.e. utilizing portions of existing ATV trails). Existing ATV trail map attached. The trail must have a side slope of no greater than 2:1. Runoff/drainage must be considered in trail layout. Final trail layout and width must be approved by Owner prior to construction. The area is somewhat remote and access is limited. Terrain varies in elevation and is uneven in some areas

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents