Similar Projects
The Dairy At Hillcrest
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Hogansville, GA 30230

I-185 From S of SR 1 to I-85
Infrastructure
Design
$4,000,000 CJ est. value
Lagrange, GA 30241

RFP General Contractors - Callaway High School Athletic Fields Sewer Lift Station
Infrastructure
Bidding
$200,000 CJ est. value
Hogansville, GA 30230

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pipes and Hydrants
Infrastructure
Post-Bid
La Grange, GA

Hills and Dales Force Main Improvements
Infrastructure
Results
Lagrange, GA

Widening and Reconstruction on US 27/SR 1(Hamilton Road)
Infrastructure
Results
$24,496,534 CJ est. value
Bremen, GA 30110

Crossvine Village - Multi-Family and Commercial
New Construction, Infrastructure - 60,000 SF
Construction
$250,000,000 CJ est. value
Lagrange, GA 30241

Rosemont Water Main Extension
Infrastructure
Post-Bid
La Grange, GA

Water System Improvements, Bass Cross Road Water Line
Infrastructure
Results
$800,000 est. value
Hogansville, GA 30230

Rosemont Elementary School
New Construction, Infrastructure
Post-Bid
$35,000,000 CJ est. value
Lagrange, GA 30241

Water System Improvements FY2021 CDBG
Infrastructure
Results
$200,000 est. value
Hogansville, GA

Hamilton Road Utilities Relocation
Infrastructure
Post-Bid
$300,000 CJ est. value
Lagrange, GA 30241

Bridge Rehabilitation on SR 219
Infrastructure
Results
$1,588,408 CJ est. value
Lagrange, GA 30240

Busch Drive Lift Station
Infrastructure
Post-Bid
$300,000 CJ est. value
Lagrange, GA 30241

Last Updated 07/18/2023 10:09 AM
Project Title

Long Cane Creek Water Pollution Control Plant Improvements

Physical Address View project details and contacts
City, State (County) Lagrange, GA 30240   (Troup County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $5,342,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes modifications and improvements to the existing wastewater treatment plant to include yard piping, hydraulic splitter box modifications, secondary clarifier modifications, aerobic digestion basin improvements, thickener reconditioning, and miscellaneous electrical and SCADA improvements. In addition to the base bid work, three alternate bid items are included with the Contract and consist of improvements to an existing pre-aeration basin mixing systems and baffles, aeration basin equipment replacement, new septage receiving station, and associated instrumentation, electrical, and SCADA work. A cashier's check or bid bond payable to the City of LaGrange, in an amount not less than five (5) percent of the amount of the bid must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. Bids must be submitted on proposal forms furnished by the Engineer. All bidders bidding in amounts exceeding that established by the state licensing board for general contractors must be licensed under the appropriate/applicable provisions of state law, and must show evidence of license before bidding or bid will not be received or considered by the Engineer; the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. The work of constructing the project will be let under one Contract if an award should be made; and the Owner reserves the right to select the Bid considered by the Owner to be in the best interest of the Owner. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interest of the Owner will thereby be promoted.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents