Similar Projects
Dollar General / Muskegon
New Construction, Infrastructure - 10,640 SF
Design
$3,000,000 CJ est. value
Muskegon, MI 49442

RFQ Engineering - Lake Harbor Pathway Engineering Services
Infrastructure
Bidding
$400,000 CJ est. value
Norton Shores, MI 49441

Site Paving Project
Infrastructure
Bidding
$800,000 CJ est. value
Muskegon, MI 49442

Bid Package 7 - North Carr Demolition and Site Renovation
Demolition, Infrastructure
Post-Bid
Muskegon, MI 49442

Horton Park Improvements Phase II
Infrastructure
Post-Bid
$200,000 CJ est. value
Muskegon, MI 49445

Turf and Athletic Improvements
New Construction, Alteration
Results
$2,900,000 est. value
Fruitport, MI 49415

Lead Service Line Replacements
Infrastructure
Results
$1,994,000 CJ est. value
Muskegon, MI 49440

Muskegon Museum of Art Expansion
Addition, Demolition, Renovation, Infrastructure
Construction
$11,200,000 CJ est. value
Muskegon, MI 49440

Northern Biomedical Research Facility
New Construction, Infrastructure
Construction
$40,000,000 CJ est. value
Muskegon Hts, MI 49444

Adelaide Pointe Condos / Muskegon
New Construction, Infrastructure
Pending Verification
$250,000,000 CJ est. value
Muskegon, MI 49440

Adelaide Pointe Hotel / Muskegon
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Muskegon, MI 49441

Muskegon Correctional Facility - Parking Lot and Driveway Repairs
Infrastructure
Bidding
$300,000 CJ est. value
Muskegon, MI 49442

Roaway Reconstruction of Leahy Street, Maffett Street and Reynolds Street Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Muskegon Heights, MI 49444

Forest Park Road Reconstruction Phase 3
Infrastructure
Results
$1,968,428 CJ est. value
Norton Shores, MI 49441

New Agricultural Barn - 2022 Bond - Montague Area Public Schools
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Montague, MI 49437

Last Updated 03/24/2023 05:15 PM
Project Title

2023 Sand Relocation Projects Muskegon State Park

Physical Address View project details and contacts
City, State (County) North Muskegon, MI 49445   (Muskegon County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Dnr - Muskegon State Park - Sand Relocation Per Terms in Attached Statement of Work Park Specification for Snow Fence removal: o Snow fence must be removed in a manner that will minimize damage to the fence and posts to preserve it for future use. o All fence material is to be rolled in tight rolls not to exceed 50 feet in length. o Fence posts must be removed in such a manner to prevent bending and distorting. o All materials used to attach fence to posts and fence to fence are to be removed from the beach by the contractor. o Fence and posts are to be stacked in a central location or on a trailer provided by the park in the proximity of the job site as designated by the Park Supervisor or his representative. Park Specifications for Sand Removal: o Remove all sand accumulations from between the parking lots, from paved roadways, from paved parking lots, from around the beach building and sidewalks, from the east shoulder of the park road, and from both sides of the park road north and south of the parking lot a distance to be established by the Park Supervisor. o The shoulders of the park road and the north and south ends of the parking lots are to be cleared a minimum of 12 feet but not more than 15 feet from the paved edge on a level grade even with the road surface. o Sand areas located between concrete surfaces or roads and parking lots must be excavated and finished to a grade no higher than the surrounding paved surfaces. o Sand must be removed from around all steps and sidewalks associated with the beach house. Final grades in the proximity of the bathhouse are to be determined by the Park Supervisor or his representative and are to be semi-finish grade. o All sand that has been removed shall be deposited and rough graded on the beach or low areas in the parking lot medians or the building. o Grading on the beach is to be a gradual slope from the parking lot edge to the water's edge of Lake Michigan as determined by the Park Supervisor or his representative. o A grade of 5% or less, 12' width by 250' length, shall be rough graded on the west side of the beach building for installation of an ADA decking down to the beach. o Tracked vehicles are not allowed on any paced surfaces without prior approval of Park Supervisor. Protection for these surfaces will be required if tracked vehicles need to pass over them. o Under no circumstances will sand be deposited into the water. o Any damage to park property shall be reported to the Park Supervisor immediately. o Contractor to coordinate date and time of sand removal around fence with Park Manager/Supervisor.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents