Similar Projects
Facility Assesment and Planning with Related Services
Term Contract
Post-Bid

Facility Assesment and Planning with Related Services
Term Contract
Post-Bid

Burnsville Transit Station Office Remodel
Renovation
Results
Burnsville, MN 55337

Houston County Highway Department Facility Bid Package 2
Renovation
Results
Caledonia, MN 55921

USCG National Multiple Award Construction Contract (NMACC III)
New Construction, Renovation, Addition
Post-Bid

USPS IQ JOC Minnesota
Renovation
Results

Target Center Kitchen 219
New Construction
Post-Bid
Minneapolis, MN

Last Updated 08/28/2021 03:02 AM
Project Title

Southern Region Headquarters Office Building Renovation

Physical Address View project details and contacts
City, State (County) New Ulm, MN 56073   (Brown County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $831,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Targeted Group Economically Disadvantaged Veteran-Owned: 2%. Work includes Selective demolish existing siding, trim, roofing, roof ridge vent, and accessories. Provide and install new wall and attic insulation and ventilation. Provide and install new fiber cement siding, trim, roofing, ridge vent, and accessories. Re-grade, install storm drainage system and landscape as necessary to improve drainage away from the building. Demolish and replace sidewalk at employee entrance. Demolish existing exterior decking, stair and guardrail at deck and entry ramp, and replace with new composite decking, stair and cable railing system.

Details

Misc. Buildings, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents