Similar Projects
Gettys Center Windows Reglazing and Abatement
Bidding
Rock Hill, SC 29730

Lexington Community Mental Health Center Window Replacement South Side and West End
Bidding
$50,000 to $90,000 est. value
Lexington, SC 29072

Overhead Door Maintenance IDIQ
Post-Bid
Columbia, SC 29207

Door Modification
Post-Bid
Less than $20,000 est. value
Gaffney, SC

Replacement of Windows and Modification of Security Window Screens in 35 Occupied Dwelling Units
Results
Abbeville, SC

Replace Visitor Center Bi Fold Doors
Results
Gaffney, SC

Window Balance Replacment
Bidding
Clover, SC 29710

Forceable Entry Doors for Fire Science Class
Post-Bid
Clover, SC 29710

Energy Savings Performance Services
Term Contract
Results
Columbia, Eastover, Hopkins, SC 29209

Six Mile Elementary School Door and Door Hardware Replacement
Bidding
Easley, SC 29640

Classroom Doors and Door Hardware Replacement
Post-Bid
Effingham, Florence, SC 29501

54--Installation of Sliding Doors
Results
Columbia, SC 29209

5670--Manual Roll Down Storm Protection ( Provide and Install)
Bidding
Columbia, SC 29209

Window Glass Repair and Replacement at Greenville High Academy
Post-Bid
Greenville, SC 29601

Detention Facility Lock Upgrade
Results
Spartanburg, SC 29303

Reported 03/06/2020 12:00 AM
Project Title

Window Replacement Project - East North Street Academy

Physical Address View project details and contacts
City, State (County) Greenville, SC 29607   (Greenville County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consist of repairs to the 2-Story window systems at E. North Street Academy along with Skylight Removal. The General Contractor will be responsible for work pertaining to but not limited to the following: l. Removal of the existing 2-Story Curtain Wall Window System, metal panels and skylights above the curtain walls. 2. The installation of new storefront window systems, metal wall panels, and roof system at the two skylight locations. 3. Repairs to brick wall to ensure a watertight building at new storefront window system. The project will be completed during the time frame of June 9, 2020 through October 9, 2020.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents