Similar Projects
Grade, Drain and Bridge - US 59
Infrastructure
Design
$21,063,165 CJ est. value
Poteau, OK 74953

Grade, Drain and Bridge - US 59
Infrastructure
Design
$21,063,165 CJ est. value
Poteau, OK 74953

Water Treatment Plant Backwash Lagoons and Lift Station
Infrastructure
Bidding
$1,278,750 CJ est. value
Wister, OK 74966

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Slabjacking and Subsealing Services
Infrastructure
Results

Carl Albert State College Pavement Project
Infrastructure
Results
$250,000 est. value
Poteau, OK 74953

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Joint Seal/Repair - US-259/SH-4/SH-63/SH-144
Infrastructure
Results
$206,000 est. value

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Water System Improvements
Infrastructure
Results
$820,256 CJ est. value
Wister, OK 74966

Build a Low Water Bridge on Cummings Avenue
New Construction, Infrastructure
Post-Bid
$273,000 est. value
Pocola, OK 74902

Dollar General / Shady Point
New Construction, Infrastructure - 10,640 SF
Post-Bid
$2,800,000 CJ est. value
Shady Point, OK 74956

One Lot of Chainlink and Poles
Infrastructure
Post-Bid
$15,000 CJ est. value
Spiro, OK 74959

Last Updated 03/28/2023 04:12 AM
Project Title

Grade, Drain and Surface - US 59

Physical Address View project details and contacts
City, State (County) Poteau, OK 74953   (Le Flore County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected December 2024
Bids Due View project details and contacts
Estimated Value $38,725,816 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us 59: From Sunset Corner, Extend West Approx 5.9 Mi As of March 28, 2023, the project is in Design status. Anticipated letting month/year is April, 2024. Length : 5.900 Mi OKDOT - Grade, Drain and Surface - US 59 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents