Similar Projects
Air Handling Unit No. 31 Upgrade
Alteration
Bidding
Houma, LA 70360

Central Elementary School Auditorium HVAC Installation
Alteration
Bidding
Bogalusa, LA

HVAC Preventive Maintenance
Post-Bid
Tampa, FL - Baton Rouge, New Orleans, LA - Austin, Benbrook, El Paso, Fort Worth, Haltom City, Horizon City, Houston, Kyle, Odessa, Pflugerville, Round Rock, San Antonio, Socorro, TX 78227

HVAC Preventive Maintenance
Post-Bid
Tampa, FL - Baton Rouge, New Orleans, LA - Austin, Benbrook, El Paso, Fort Worth, Haltom City, Horizon City, Houston, Kyle, Odessa, Pflugerville, Round Rock, San Antonio, Socorro, TX 78227

Hvac Maintenance
Alteration
Results
Baton Rouge, LA

Heating Ventilating and Air Conditioning Mechanical and Building Automation Services
Alteration
Results
New Orleans, LA

Port Improvements Infrastructure For Biofuels Facility Repurposing 612 Building Odor Control Scrubber System
Infrastructure
Bidding
$225,000 to $325,000 est. value
Alexandria, LA

Replace Two 80 Ton Air Cooled Chillers
Alteration
Post-Bid
Jackson, LA 70748

HVAC Maintenance for DPS
Alteration
Results
Baton Rouge, LA

3 Ton A/C and Heat Pump Units
Alteration
Bidding
Lacombe, LA

LEC HVAC Air Disinfection System Installation
Alteration
Post-Bid
New Orleans, LA

Port-Wide Heating Ventilating and Air Conditioning (HVAC) Services
Alteration
Results
New Orleans, LA

HVAC Equipment
Alteration
Bidding
West Monroe, LA

A/C and Heat Window Units
Alteration
Post-Bid
LA

Cooling Tower for Rapides Parish Courthouse
Alteration
Results
Alexandria, LA

Last Updated 10/07/2021 03:26 PM
Project Title

HVAC System Cleaning

Physical Address View project details and contacts
City, State (County) Venice, LA 70091   (Plaquemines County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations, All Bids Received, Selection Underway
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK: The below was taken from the SOW and intended to provide a general description of this requirement. The Contractor shall complete all work assigned but not limited to the requirements with-in this scope. Work scope is to include, but not limited to: The work to be performed consists of: Contractor shall provide all services for the cleaning and sanitation of the HVAC system and components in accordance with the SOW. All work shall comply with current International Building Codes. For proposal purposes: Contractor shall provide pricing for all base and option items. Clean and sanitize all HVAC ducting Clean and sanitize 01 air handler Clean and sanitize 25 fan coil units Clean and sanitize 55 Air Diffusers, 30 Air inlets & 20 Exhaust vents All cleaning and sanitizing to be completed per NADCA ACR standards. Refuse, excess or waste materials resulting from operations shall become the property of the Contractor and shall be recycled and/or disposed of off Government property. All refuse or recycling disposal shall be done in accordance with federal, state, and local laws and regulations. 12 ft ladders will be required to access FCU and main air handler. Model number of the HVAC system: CGAM 040A 2002 AXD2 A1B1 B1JX XA1Q 1A4X XXXX XB1A 3A1D 1XXDC XX

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents