Similar Projects
Fall River Five Cents Savings Bank
New Construction
Conception
Dartmouth, MA 02747

Troy Street Multi-Family
New Construction, Renovation
Design
Fall River, MA 02720

Roadway Materials / Services FY 2023
Infrastructure
Bidding
Freetown, MA

Type I Bituminous Concrete - Approximately 2500 Tons in Place - SUB Bid
Infrastructure
Sub-Bidding
$225,000 est. value
Berkley, MA

Road Salt
Post-Bid

Fiscal Year 2022 Roadway Materials/Services
Term Contract
Post-Bid
Freetown, MA

Apartment Door and Storm/Screen Door Replacement, Metropolitan Park 705-1A and Chappell Street 705-1C
Results
Less than $32,000 est. value
Seekonk, MA

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Blanche A Ames Elementary School - Phase I
New Construction - 148,422 SF
Construction
$63,600,000 est. value
Easton, MA 02356

23 - 25 Gurney Road Solar
New Construction
Pending Verification
Freetown, MA 02717

Sunflower Way & Daisy Lane - Residential Subdivision
New Construction
Pending Verification
Taunton, MA

Type I Bituminous Concrete - Approximately 2,000 Tons In Place.
Term Contract
Post-Bid
Less than $200,000 est. value
Berkley, MA

Stone Seal Treated
Infrastructure
Results
$353,100 est. value
Dartmouth, MA

Type I Bituminous Concrete - Approximately 2,000 Tons In Place.
Term Contract
Post-Bid
Less than $200,000 est. value
Berkley, MA

FY2022 Concrete Materials
Term Contract
Post-Bid
Attleboro, MA

Reported 06/09/2022 12:00 AM
Project Title

Road Materials

Physical Address View project details and contacts
City, State (County) Berkley, MA   (Bristol County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Road Materials 1.) Type I Bituminous concrete - price "at plant" and "in place" (4,000 tons plus or minus) - Cold patch - at plant and delivered 2.) Road salt - delivered (35 ton delivery)- 1500 tons plus or minus - must be delivered within 3 business days from the date ordered. 3.) Screened Sand - delivered 4.) Single Chip Seal - delivered in place - 10,000 yards plus 5.) Double Chip Seal - delivered in place - 10,000 yards plus 6.) Road oil, all grades plus asphalt emulsions - delivered in place 7.) Catch basins, and Manholes - A. precast and B. block (10 plus) 8.) Manhole and catch basin covers (10 plus) - 4 in, 6 in. 8 in. 9.) Guard rail by the foot, installed (100 ft. plus) 10.) Concrete (50 yards plus) priced by yard - delivered to site 11.) Crack Sealing delivered in place - by the gallon 12.) Full Depth Reclamation - priced by the square yd. with and without calcium chloride added 13.) Catch Basin Cleaning - priced per basin 14.) Line striping by the foot - 30 miles or more. 4" white or yellow chlorinated rubber w/glass.

Details

Division 31 - Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork.
Division 32 - Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents