Similar Projects
Downtown Streetscape Crosswalk Enhancements
Infrastructure
Conception
Santa Maria, CA

El Cajon Branch Library
New Construction, Infrastructure
Conception
$30,300,000 est. value
El Cajon, CA 92020

Camarillo Hills Drain Replacement at Ventura Boulevard - SD-5052 - City of Camarillo
Infrastructure
Design
Less than $12,760,000 est. value
Camarillo, CA 93011

MPA Route 140 Pavement Preservation
Alteration
Design
$24,126,000 est. value
Mariposa, CA 95338

Proposed Grayson Repowering Demolition and Site Improvement
Demolition, Infrastructure
Bidding
Gardena, CA

Exterior Envelope and Site Improvements at Huff Gardens Apartments
Infrastructure
Bidding
$525,000 est. value
San Jose, CA 95128

Laurel Avenue at Randall Avenue
Alteration
Post-Bid
Fontana, CA 92331

CHP - Gilroy Commercial Vehicle Enforcement Facility (CVEF) Northbound (NB) - Parking Lot Steam Cleaning Services
Infrastructure
Post-Bid
San Martin, CA 95046

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

SF State Science Replacement Building - Earthwork
Infrastructure
Results
San Francisco, CA

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

South ECR WMR, Phase 1 Sanchez to Barroilhet - City of Burlingame
Infrastructure
Construction
$5,113,000 est. value
Burlingame, CA

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

Downtown Alley Rehabilitation - Mid Way - City Of Brentwood
Alteration
Conception
$2,100,000 est. value
Brentwood, CA 94513

New Light Industrial Building - Shell
New Construction, Infrastructure - 33,000 SF
Design
$4,500,000 est. value
Richmond, CA 94804

Reported 07/19/2022 03:19 PM
Project Title

Wetland Mitigation Bank

Physical Address View project details and contacts
City, State (County) Lincoln, CA 95648   (Placer County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Site Development
Contracting Method Competitive Bids.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value $2,627,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Wetland Mitigation Bank Project ID : 0316000177 Bkpm: 19.46 Ahpm : 19.5 Proposed Advertise Date : 02/02/2023 As of July 18, 2022, the project is in Design status. Anticipated construction year is 2023. CADOT - Wetland Mitigation Bank *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents