Similar Projects
University Of Tulsa Thomas Plaza
Renovation, Alteration
Design
Tulsa, OK 74104

Renovation Project
New Construction
Design
Durant, OK

OSU New Frontiers Ag Hall Project
New Construction
Bidding
Stillwater, OK 74074

Shepler Center Elevator Addition
Addition
Post-Bid
Lawton, OK 73505

Bathroom Renovation for McClarren Hall - Connors State
Renovation
Post-Bid
Warner, OK

WCC Office Renovation
Renovation
Results
$622,000 est. value
Oklahoma City, OK 73105

Gallogly Hall 4th Floor Project
Renovation
Results
Norman, OK

Research Lab Improvements
Renovation
Post-Bid
Norman, OK 73069

OU Rowing Training Room
New Construction
Post-Bid
Norman, OK 73019

Kiamichi Tech Stigler Campus Remodel
Renovation
Post-Bid
Stigler, OK 74462

Moore Norman Technology Center Steel Building
New Construction
Post-Bid
Norman, OK

Hot Tub Renovation
Renovation
Post-Bid
Oklahoma City, OK 73104

Nursing Simulation Lab
Addition - 3,400 SF
Post-Bid
Kansas, OK

Devon Energy Hall Room 210 Office Buildout
Build-Out
Post-Bid
Norman, OK 73069

ORU Library and Holy Spirit Research Center
Renovation - 41,000 SF
Post-Bid
Tulsa, OK 74171

Reported 02/11/2022 12:00 AM
Project Title

Preclinical Translation Research Renovation

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73117   (Oklahoma County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency - 01/05/22
Owner View project details and contacts
Architect View project details and contacts
Description

Details

College/University, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents