Similar Projects
RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Design
Schaumburg, IL 60194

RFQ - Various Phase II Traffic Signal Coordination and Timing (SCAT) Projects, Various Routes
Term Contract
Design
$300,000 CJ est. value
Springfield, IL 62703

Varible Width Pavement Resurfacing
Infrastructure
Bidding
$300,000 CJ est. value
Elgin, IL 60120

Varible Width Pavement Resurfacing
Infrastructure
Bidding
$300,000 CJ est. value
Elgin, IL 60120

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

2021 Street Program
Post-Bid
Elburn, IL

The Improvement Consists of Cleaning (Nighttime Sweeping) Various Expressways Throughout District One in Various Counties
Results

2021 HMS Culvert Replacement - Bid Release 4
Results
Hampshire, IL 60140

Trout Park Playground Renovation
Infrastructure
Bidding
$200,000 CJ est. value
Elgin, IL 60120

Laurel Street Culvert Replacement
Post-Bid
Elgin, IL 60120

Culvert Removal and Replacement
Results
Kaneville, IL 60144

Site Work Combined Maintenance Facility
Infrastructure
Bidding
$300,000 est. value
Aurora, IL 60502

Roadway Resurfacing
Post-Bid
Saint Charles, IL

Parking Lot N4 Drainage Improvements
Results
Sugar Grove, IL 60554

Alft Lane and Randall Road Intersection Improvements
Infrastructure
Bidding
$4,000,000 est. value
Elgin, IL 60124

Last Updated 07/25/2022 05:01 PM
Project Title

2022 Street Resurfacing and Sidewalk Replacement Program

Physical Address View project details and contacts
City, State (County) Batavia, IL 60510   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

City/County - Batavia Resurfacing of 7.89 miles hma pavement, curb and gutter removal and replacement, sidewalk removal and replacement, new sidewalk placement, driveway pavement removal and replacement, culvert replacement, structure adj., install of pavement marking. Project location: Various Streets within the City of Batavia Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Resurfacing of HMA Pavement, Curb and Gutter Removal and Replacement - 22-00000-00-GM

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents