Similar Projects
Carter-Lee Park - Town of Smyrna
Infrastructure
Conception
$600,000 CJ est. value
Smyrna, TN 37167

1R Lift Station Upgrade - Town Of Smyrna
Renovation, Infrastructure
Conception
$1,500,000 CJ est. value
Smyrna, TN 37167

Patterson Park Community Center Playground
Infrastructure
Design
$300,000 CJ est. value
Murfreesboro, TN 37130

Graystone - Section 1
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Murfreesboro, TN 37127

Aldi #102 / Murfreesboro
New Construction, Infrastructure - 20,450 SF
Bidding
$6,000,000 CJ est. value
Murfreesboro, TN 37128

2022 Rehabilitation Project
Infrastructure
Bidding
$2,000,000 CJ est. value
Murfreesboro, TN 37130

Goddard School
New Construction
Post-Bid
Murfreesboro, TN 37129

Public Works and Community Development Services Facility Sitework Package
Infrastructure
Post-Bid
La Vergne, TN

2016 LPRF Jordan Farms New Public Restroom, Pump Station, and Forcemain
New Construction, Infrastructure - 1,340 SF
Results
Murfreesboro, TN

McFadden Basketball Court t- Phase 1: Site Work, Concrete Pad, and Basketball Goals Installation
Renovation, Alteration
Results
Murfreesboro, TN 37130

RFQ Design - Construct Sleep Disorder and Specialty Clinics Design - Murfreesboro
Addition, Demolition, Infrastructure, Renovation - 18,600 SF
Pending Verification
$20,000,000 CJ est. value
Murfreesboro, TN 37129

True Gospel Missionary Baptist Church Expansion
New Construction, Infrastructure - 3,865 SF
Pending Verification
$900,000 CJ est. value
Murfreesboro, TN 37129

Whataburger / Smyrna
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Smyrna, TN 37167

Todd Lane Park - Town of Smyrna
Infrastructure
Design
$400,000 CJ est. value
Smyrna, TN 37167

Upper Chaney Woods Interceptor Sewer (Segments 4 and 3)
Infrastructure
Post-Bid
$3,000,000 CJ est. value
La Vergne, TN 37086

Last Updated 10/27/2022 01:08 PM
Project Title

Primrose Daycare / Smyrna

Physical Address View project details and contacts
City, State (County) Smyrna, TN 37167   (Rutherford County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Pre-School/Daycare, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $4,200,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: New Construction with Site Work of a 13,600 SF Day Care Center. As of October 14, 2022, a general contractor has not yet been selected for this project. A firm construction timeline for this project has not yet been released. Trades includes, but are not limited to, roofing (TPO-Flat roof) and additional trades except for Structural Steel

Details

13,600 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents