Similar Projects
Last Updated | 07/26/2023 08:08 AM |
Project Title | Pierce County Parks Pipeline Trail Phase 1 Project |
Physical Address | View project details and contacts |
City, State (County) | Tacoma, WA 98405 (Pierce County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $7,400,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Pipeline Trail Project Phase 1 - Pierce County Construct 1.6 miles of a new regional shared use trail with adjacent soft surface trail; utility service road and residential driveway improvements; new trailhead including access road, standard vehicle parking lot, equestrian trailer parking lot, restroom building, connecting trails and pedestrian bridge, environmental mitigation, electrical, stormwater, domestic water, on-site septic, landscaping and irrigation improvements. The proposed work includes all necessary permits, fees, materials, equipment, labor and related items to construct the facility and improvements to the property located in Pierce County, WA as shown on the Contract Drawings and Specifications. Work generally includes, but is not limited to: mobilization, temporary construction fencing, temporary erosion and sediment control, existing vegetation protection, clearing and grubbing, demolition, stormwater drainage improvements, domestic water service improvements, on-site septic improvements, electrical service and connections, prefabricated restroom building foundation pad preparation for installation by others, premanufactured pedestrian bridge installation, earthwork, concrete paving, asphalt paving, gravel surfacing, frontage improvements, parking lot striping, signage, irrigation, planting and site cleanup. BID SECURITY: A 5% bid bond must accompany all bids, and a 100% payment and performance bond will be required from the successful bidder. HOLDING BIDS: No bids shall be withdrawn after the opening of the bids for a period of sixty (60) days after the scheduled time set for submission of bids. TIME FOR COMPLETION: The Contractor will be required to substantially complete all basic bid and alternate work within 270 CALENDAR DAYS OF NOTICE TO PROCEED The contractor will have an additional 30 CALENDAR DAYS to reach Final Completion and Acceptance for a total of 300 CALENDAR DAYS. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |