Similar Projects
I-5/179th Street Interchange - Interchange Improvements
Infrastructure
Conception
$42,001,000 CJ est. value
Tacoma, WA 98409

I-5/179th Street Interchange - Interchange Improvements
Infrastructure
Conception
$42,001,000 CJ est. value
Tacoma, WA 98409

I-5/Denny Way - Lakeview Viaduct - Deck Overlay and Expansion Joint
Infrastructure
Design
$26,186,000 CJ est. value
Tacoma, WA 98409

I-5/Denny Way - Lakeview Viaduct - Deck Overlay and Expansion Joint
Infrastructure
Design
$26,186,000 CJ est. value
Tacoma, WA 98409

Installation of Concrete Slab Construction of A Steel Building
New Construction, Infrastructure
Post-Bid
$20,000 est. value
Lakewood, WA

Penmet Parks Community Recreation Center
New Construction, Infrastructure - 189,500 SF
Post-Bid
$3,000,000 CJ est. value
Gig Harbor, WA 98335

SR 167,I-5 to SR 509 - New Expressway
Infrastructure
Results
$325,000,000 to $375,000,000 est. value
WA

SR 7, SR 507 to S of S 38th ST - Paving
Infrastructure
Results
$1,500,000 to $2,000,000 est. value
WA

Point Defiance Zoo and Aquarium South Pacific Aquarium Tank and Exhibit Improvements
Renovation, Infrastructure
Construction
$3,736,964 CJ est. value
Tacoma, WA 98407

Fox Island Bridge #26211-A Girder Repair
Infrastructure
Construction
$429,860 CJ est. value
Tacoma, WA 98405

Frederickson Self Storage
New Construction, Infrastructure - 95,000 SF
Pending Verification
$10,300,000 CJ est. value
Tacoma, WA 98446

Frederickson Self Storage
New Construction, Infrastructure - 95,000 SF
Pending Verification
$10,300,000 CJ est. value
Tacoma, WA 98446

I-5/SB over I-705 and RR - Special Repairs
Infrastructure
Conception
$750,000 CJ est. value
Tacoma, WA 98418

Sixth Avenue Apartment Development
New Construction, Infrastructure
Design
$150,880,000 CJ est. value
Tacoma, WA 98406

Septic System Replacement
Infrastructure
Post-Bid
$100,000 CJ est. value
Tacoma, WA 98446

Last Updated 07/26/2023 08:08 AM
Project Title

Pierce County Parks Pipeline Trail Phase 1 Project

Physical Address View project details and contacts
City, State (County) Tacoma, WA 98405   (Pierce County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $7,400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Pipeline Trail Project Phase 1 - Pierce County Construct 1.6 miles of a new regional shared use trail with adjacent soft surface trail; utility service road and residential driveway improvements; new trailhead including access road, standard vehicle parking lot, equestrian trailer parking lot, restroom building, connecting trails and pedestrian bridge, environmental mitigation, electrical, stormwater, domestic water, on-site septic, landscaping and irrigation improvements. The proposed work includes all necessary permits, fees, materials, equipment, labor and related items to construct the facility and improvements to the property located in Pierce County, WA as shown on the Contract Drawings and Specifications. Work generally includes, but is not limited to: mobilization, temporary construction fencing, temporary erosion and sediment control, existing vegetation protection, clearing and grubbing, demolition, stormwater drainage improvements, domestic water service improvements, on-site septic improvements, electrical service and connections, prefabricated restroom building foundation pad preparation for installation by others, premanufactured pedestrian bridge installation, earthwork, concrete paving, asphalt paving, gravel surfacing, frontage improvements, parking lot striping, signage, irrigation, planting and site cleanup. BID SECURITY: A 5% bid bond must accompany all bids, and a 100% payment and performance bond will be required from the successful bidder. HOLDING BIDS: No bids shall be withdrawn after the opening of the bids for a period of sixty (60) days after the scheduled time set for submission of bids. TIME FOR COMPLETION: The Contractor will be required to substantially complete all basic bid and alternate work within 270 CALENDAR DAYS OF NOTICE TO PROCEED The contractor will have an additional 30 CALENDAR DAYS to reach Final Completion and Acceptance for a total of 300 CALENDAR DAYS.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents