Similar Projects
Venue 1012 Parking Lot Maintenance - Village of Oswego
Infrastructure
Conception
$320,000 est. value
Oswego, IL

Wolfs Crossing Road Reconstruction-Segment 3 - Roth Road - Village of Oswego
Alteration
Conception
$6,101,000 est. value
Oswego, IL 60543

Milling and Resurfacing
Infrastructure
Bidding
$4,000,000 est. value
Yorkville, IL 60560

Milling and Resurfacing (Designed Overlay) and ADA
Infrastructure
Bidding
$4,000,000 est. value
Plano, IL 60545

Mill Road Reconstruction
Post-Bid
Yorkville, IL

Oakwood Cemetery Lane Improvements
Post-Bid
Joliet, IL

2021 MFT and Infrastructure Road Program
Results
Less than $2,965,600 est. value

2021 Road Program
Results
Yorkville, IL

Water Main Replacement Van Buren, South Adams - Village Of Oswego
Infrastructure
Conception
$1,581,000 est. value
Oswego, IL

Resurface Bristol Ridge Road
Infrastructure
Bidding
$4,000,000 est. value
Bristol, IL 60512

Village Hall Parking Lot and Sidewalk Improvements
Post-Bid
Oswego, IL

2021 Grove Road Trail ADA Improvements
Results
Oswego, IL 60543

2021 Bituminous Patching Materials
Post-Bid
Joliet, IL

Variable Width Pavement W/Hot-Mix Asphalt
Results
Joliet, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Reported 06/15/2022 09:36 AM
Project Title

Wolfs Crossing Road Reconstruction -Segment 2 - Douglas - Village of Oswego

Physical Address View project details and contacts
City, State (County) Oswego, IL 60543   (Kendall County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected January 2026
Bids Due View project details and contacts
Estimated Value $5,201,300
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruction of Wolf's Crossing Road from 0.03 miles west of Bluegrass Parkway to 0.05 miles west of Douglas Rd South, a of distance 0.39 miles. (CMAP TIP ID: 09-16-0013). The project includes construction of a roundabout, five (5) lane cross section on Wolf's Crossing, sidewalk, path, and landscaping. This location is identified as Segment 3 within the Project Design Report. This project is in included in the Village of Oswego FY 2023-2027 Capital Improvement Plan (CIP). As of June 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents