Similar Projects
Trilogy Veterinary Medical Center
New Construction - 375 SF
Conception
Chandler, AZ 85249

Banfield Animal Hospital
Renovation - 3,500 SF
Conception
Peoria, AZ 85383

Katz and Dogs Wellness Clinic
Renovation - 3,260 SF
Design
Peoria, AZ 85382

The Pet Club
Renovation - 1,112 SF
Design
Chandler, AZ 85224

The Pet Doctor
Renovation - 7,100 SF
Post-Bid
Chandler, AZ

Animal Shelter Design-Build
Post-Bid
Less than $2,000,000 est. value
Kingman, AZ 864027000

Military Working Dog (MWD) Kennel Lining
Results
Glendale, AZ 85309

Construction Manager at Risk for Animal Care and Control Facility and Site Improvements
New Construction
Results
Less than $2,800,000 est. value
Globe, AZ 85501

Animal Control Center Surgical Expansion
Renovation - 11,000 SF
Construction
$250,000 to $500,000 est. value
Sierra Vista, AZ

Banfield Pet Hospital
Renovation - 3,286 SF
Construction
$450,000 est. value
Mesa, AZ 85203

Reid Park Zoo Asian Expansion
New Construction
Pending Verification
$12,000,000 est. value
Tucson, AZ 85716

Banfield Animal Hospital
Renovation - 3,500 SF
Design
Peoria, AZ 85383

Zoo Specialty Construction JOC
Term Contract
Post-Bid
Less than $400,000 est. value
Tucson, AZ

Z--Kitchen Quarters(5) Remodeling
Renovation
Results
Kingman, AZ 86445

Compassion First Vet Clinic
Renovation, Addition - 12,120 SF
Construction
$1,400,000 est. value
Phoenix, AZ 85024

Last Updated 07/15/2019 12:06 PM
Project Title

Construction Manager At Risk for Reid Park Zoo

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85716   (Pima County)
Category(s) Animal/Plant/Fish Facility
Sub-Category(s) Animal/Plant/Fish Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $22,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The CM@R team will be required to closely work together with all involved parties. The design and construction teams will be responsible to define, monitor and stay within the project budget and schedule. The budget is set for this project and additional funds are not available. The CM@Risk contractor for the project will ensure the team is adhering to the project schedule and will be responsible to provide repetitive cost and constructability alternatives throughout the design and construction process. This project represents the first phase implementation of the zoos 2018 master plan, which consists of four major components: a new flamingo exhibit, treetop playhouse (elevated childrens play area), renovation of the existing front entry area and a 3.5 acre expansion for Asian exhibits, including a 7,800 SF building.
Details 1 Animal/Plant/Fish Facility, 1 Story Above Grade, 7,800 SF New Construction Building, 3.50 Acres.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents