Similar Projects
Pinewood Townhomes
New Construction, Infrastructure
Conception
$66,000,000 CJ est. value
Chattanooga, TN 37421

North Edgehill Commons
New Construction, Infrastructure - 160,000 SF
Design
$361,000,000 CJ est. value
Nashville, TN 37203

MTRO Essential Maintenance
Renovation, Infrastructure
Design
$3,400,000 CJ est. value
Nashville, TN 37214

South Main Extended Drainage Improvements
Infrastructure
Bidding
$178,348 CJ est. value
Collierville, TN 38017

Site Preparation/Excavation
Post-Bid
Cleveland, TN 37311

StayAPT Suites / Memphis
Demolition, New Construction, Infrastructure - 39,600 SF
Post-Bid
$25,000,000 CJ est. value
Memphis, TN 38016

Fred Young Park Equestrian Center - Site Package
Results
Jackson, TN 38305

Tellico West 16 Acre Industrial Site Grading
Infrastructure
Results
Vonore, TN

Dutch Bros / Sevierville
New Construction, Infrastructure - 950 SF
Construction
$500,000 CJ est. value
Sevierville, TN 37862

The Crestmoor Elderly Care Facility / Nashville
Demolition, New Construction, Infrastructure - 350,000 SF
Construction
$54,000,000 CJ est. value
Nashville, TN 37215

Hospice Residence Home- Assisted Living Facility
Renovation
Pending Verification
Cookeville, TN 38501

Harmony at Morning Wood Senior Living
New Construction - 72,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Memphis, TN 38002

Storyville Gardens Phase 1
New Construction, Infrastructure
Design
$300,000,000 CJ est. value
Nashville, TN 37219

Harris Street Elderly
Renovation
Post-Bid
$200,000 est. value
Sparta, TN 38583

2016 LPRF Jordan Farms New Public Restroom, Pump Station, and Forcemain
New Construction, Infrastructure - 1,340 SF
Results
Murfreesboro, TN

Last Updated 03/09/2023 01:04 PM
Project Title

Geriatric Mental Health Hospital / Dickson

Physical Address View project details and contacts
City, State (County) Dickson, TN 37055   (Dickson County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Assisted Living Facility, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $5,709,429 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of project is new construction of senior living facility for mental health. As of March 9, 2023, this project is in conception. Information regarding the architect and general contractor has not been disclosed. A firm construction timeline has not been set.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

14,200 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents