Similar Projects
North Campus Chiller Plant - Cooling Tower Replacement
Alteration
Bidding
Urbana, IL 61801

HVAC Supply House
Alteration
Bidding
IL

Hardwood Synthetic Sports Flooring
Post-Bid

Hardwood Synthetic Sports Flooring
Post-Bid

HVAC Equipment Replacement
Results
Evanston, IL 60201

Hurley ES Pool
Results
Chicago, IL 60602

New Litchfield Elementary School - Bid Group No. 1
New Construction, Infrastructure - 42,071 SF
Bidding
$13,000,000 to $14,000,000 est. value
Litchfield, IL 62056

Carpet & Flooring
Post-Bid
Moline, IL 61265

Chiller Bundle Repair and Replacement
Results
Chicago, IL 60622

J0199 Carpet Install Effingham Rob
Term Contract
Post-Bid
Effingham, IL 62401

Disaster Recovery Services
Results

Building Automation Systems-Flannery
Term Contract
Post-Bid
$250,000 est. value
Chicago, IL 60612

Chiller Repair at Sandoval Elementary School
Results
Chicago, IL 60629

Rooftop Solar Panel Installation and Operations
Post-Bid
Highland Park, IL 60035

Chiller Repair at National Teachers Academy
Results
Chicago, IL 60602

Last Updated 08/05/2021 12:57 PM
Project Title

Goreville Grade School Gym HVAC Replacement

Physical Address View project details and contacts
City, State (County) Goreville, IL 62939   (Johnson County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Flooring, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work under Base Bid for the General Contract to include the complete demolition of the existing wood gym floor and the partial demolition of the existing concrete slab-on-grade and under slab sewer line. New work to include the installation of a new sewer line across the gym, new concrete slab-on-grade infill, and a new wood gym floor with court striping within the gymnasium. Work under Base Bid for the Mechanical Contract to include the complete demolition of the existing ceiling mounted gas unit heaters, vents, and side wall louvers. New work to include new mechanical roof mounted curb, one roof top unit, exterior mechanical ductwork, EPDM roof patching, interior fabric ductwork, and gas line modifications and painting. Corresponding Mechanical, Plumbing, and Electrical Systems will also be included.

Details

Division 02 - Existing Conditions.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents