Similar Projects
Michelson Water Recycling Plant Tertiary Filter Improvements
Renovation, Infrastructure
Bidding
$17,899,000 CJ est. value
Irvine, CA 92612

RFP - Construction Management Services for the Spinnaker Bay Drive Water Main Replacement Project - Phase 2 (MC-5200)
Infrastructure
Bidding
$2,600,000 CJ est. value
Long Beach, CA 90803

F-End Piping Modification
Infrastructure
Sub-Bidding
Los Angeles, CA 90012

Plumbing Upgrade for the City of Bakersfield Animal Care Center
Renovation
Sub-Bidding
$97,000 CJ est. value
Bakersfield, CA 93307

Design and Construction of a Monitor Steel Frame Barn Building at the George A. Ingalls Event Center
New Construction, Term Contract, Alteration
Post-Bid
Norco, CA

Airport Plumbing Repairs and Inspections as Requested
Alteration
Post-Bid
Livermore, CA 94551

District Wide HVAC Replacements 11 Campuses (COVID) - Plumbing
Alteration
Results
$1,000,000 est. value
Hesperia, CA 92344

Industrial Water Treatment Services
Alteration
Results
$100,000 est. value
San Diego, CA

Main Street, Fourth Street, And Mission Road Sewer Main Replacement Project - Phase 1
Infrastructure
Bidding
$3,000,000 CJ est. value
Alhambra, CA 91801

Testing, Maintenance, and Repair of Underground Fuel Storage Tanks
Term Contract
Sub-Bidding
Santa Monica, CA 90401

On-Site Non-Potable Water Reuse Strategy
Alteration
Post-Bid
$250,000 est. value
Sacramento, CA

Glen Avon Elementary School Sitework
Renovation, Infrastructure, Alteration
Results
$1,300,000 est. value
Riverside, CA 92509

Plumbing Supplies
Term Contract
Sub-Bidding
Long Beach, CA 90810

As Needed Plumbing Maintenance and Repair for Met In-Town Housing (Multiple Locations)
Alteration
Post-Bid
$240,000 est. value
Los Angeles, CA 90012

As Needed Plumbing Services
Term Contract
Results
Oakland, CA

Last Updated 04/11/2023 05:33 PM
Project Title

Fish Hatchery Supply Pump Replacement Project

Physical Address View project details and contacts
City, State (County) Ukiah, CA 95482   (Mendocino County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $432,500 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement pump and motor, includes shipping to site. Seismic analysis of pump. Removal of existing and installation of new pumps. Piping modifications for new pump installation (if applicable). Structural modifications for new pump installation (if needed). Wiring and other electrical modifications needed to support new pump. Testing of new pumps. The City Council reserves the rightto reject any or all bids and to determine which proposal is, in its opinion, the lowest responsive bid by a responsiblebidder and which it deems in the best interest of the City to accept.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents