Similar Projects
Downtown Streetscape Crosswalk Enhancements
Infrastructure
Conception
Santa Maria, CA

Avalon Pedestrian Bridge and Gateway Projects - Port of Los Angeles - Construction Division
New Construction, Infrastructure
Conception
Los Angeles, CA 90744

Site Prep SPS Sterilizers and Equipment - Building 126 - 7th Floor
Renovation, Alteration
Design
Long Beach, CA 90822

Camarillo Hills Drain Replacement
Infrastructure
Design
Less than $12,760,000 est. value
Camarillo, CA 93011

Proposed Grayson Repowering Demolition and Site Improvement
Demolition, Infrastructure
Bidding
Gardena, CA

Graphic Arts and Nursing Site Improvement Project
Infrastructure
Bidding
$500,000 est. value
Monterey, CA 93940

Scott Rd, Pittman Lane, And Barton Banks Rd Street Improvements
Alteration
Post-Bid
Irvine, CA 92602

Storm Drain Improvements
Infrastructure
Post-Bid
Chino, CA 91709

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

SF State Science Replacement Building - Earthwork
Infrastructure
Results
San Francisco, CA

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

Runway Precision Approach Path Indicator - 49015 - City of Fullerton
Renovation, Infrastructure, Alteration
Conception
$250,000 est. value
Fullerton, CA 92833

Nature Explore Site Improvement and Parking Lot Site Improvement at Kentwood Early Education Center
Infrastructure
Bidding
$966,000 est. value
Los Angeles, CA 90045

Laurel Avenue at Randall Avenue
Alteration
Post-Bid
Fontana, CA 92331

Reported 06/15/2022 05:02 PM
Project Title

Downtown Alley Rehabilitation - Mid Way - City Of Brentwood

Physical Address View project details and contacts
City, State (County) Brentwood, CA 94513   (Contra Costa County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $2,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the installation of new water, sewer, and storm drain facilities and either the removal or replacement of existing infrastructure to correct existing operations and maintenance constraints due to the age of the facilities. This project will allow the City to accommodate the anticipated development of the Downtown area and, where feasible, bring the aging facilities up to current standards. This project is included in the City of Brentwood's FY 2021/2022-2025/2026 Capital Improvement Program (CIP). As of June 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents