Similar Projects
Rehabilitation - Aiken County
Infrastructure
Bidding
SC

2020 Greenway Resurfacing
Results
North Augusta, SC 29841

Rehabilitation - S-5 Aiken Co
Results
SC

Corridor Improvement - SC 118 (Hitchcock Parkway)
Results
SC

Rehabilitation - Aiken County
Results
SC

Preservation- Aiken County
Results
SC

Road Pavings In Wagener, Salley, Springfield
Results
Less than $1,808,733 est. value
Aiken, SC

2021 Asphalt Track Resurfacing at Paul Knox Middle School
Results
North Augusta, SC 29841

Rehabilitation - Aiken Co
Infrastructure
Results
SC

Intersection Improvements - US 278
Infrastructure
Results
SC

Ballard Drive Paving
Infrastructure
Results
$673,651 est. value
Aiken, SC 29847

Safety Improvements
Infrastructure
Results

USC Aiken Convocation Center Parking Lot Coating and Stripe
Infrastructure
Results
$100,000 to $150,000 est. value
Graniteville, SC 29829

Preservation - District 7
Infrastructure
Results

Safety Improvements - District 7
Infrastructure
Results

Last Updated 12/14/2021 11:37 PM
Project Title

Safety Improvements - S-145 (Aiken Co)

Physical Address View project details and contacts
City, State (County) SC   (Aiken County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Railroad Insurance And Flagging 001 1.000 Ls Selected Clearing 1.000 Ls Removal & Disposal Of Existing Pavement 2,405.000 Sy Unclassified Excavation 555.000 Cy Borrow Excavation 3,720.000 Cy Excavation For Shoulder Paving 982.080 Sta Hauling Of Excavated Shoulder Material 982.080 Sta Maintenance Stone 110.000 Ton Hma Shoulder Widening Course 6,956.000 Ton Liquid Asphalt Binder Pg64-22 1,135.000 Ton Full Depth Asph. Pav. Patching 6" Unif. 10,912.000 Sy Milling Existing Asphalt Pavement (Variable) 1,155.000 Sy Milled-In Rumble Strip 30.000 Mi Hot Mix Asphalt Surface Course Type c 12,412.000 Ton Driveway Paving-Surface Type d 700.000 Ton Permanent Construction Signs (Ground Mounted) 632.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 6,000.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 300,000.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 2,700.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 6.000 Ea Railroad Crossing Symbols - Fast Dry Paint 6.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 37,719.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 229,956.000 Lf 6" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 2,000.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 100,484.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 240.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 900.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 2.000 Ea Railroad Crossing Symbols - Thermoplastic - 125 Mil. 2.000 Ea 6" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 12,573.000 Lf 6" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 76,652.000 Lf 24" Yellow Solid Lines - Thermoplastic - 125 Mil. 900.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 6.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 700.000 Ea Evaluation Of Pavement Marking Retroreflectivity 1.000 Ls Guardrail Delineator - White 130.000 Ea Remove & Dispose Semi-Rigid Gr Device 80.000 Lf Premash w-Beam Strong Post System Wsp3 837.500 Lf Mt3 Leading End Treatment Tl3 22.000 Ea Mgs3 Gr Standard Shoulder 2,362.500 Lf Premash Type t Tl3 Leading 50' 4.000 Ea Permanent Grassing For Small Projects 9.020 Acre Silt Fence 5,550.000 Lf Replace/Repair Silt Fence 555.000 Lf Removal Of Silt Retained By Silt Fence 1,388.000 Lf

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents