Similar Projects
Roof Replacement at Miller Intermediate
Post-Bid
Houston, TX

Roof Repair CREW
Term Contract
Post-Bid
Houston, TX

UHV Jaguar Hall Roof Replacement
Results
Houston, TX

UCT Data Center Roof Replacement
Results
Houston, TX

Roofing Repairs and Replacement Services
Post-Bid
Houston, TX 77000

Harmony Public Schools - Roof Refurbishments Project
Results
Houston, TX

City Hall Roof Replacement
Post-Bid
Less than $800,000 est. value
Houston, TX 77002

2019 Roof Replacement Package
Results
Webster, TX 77598

National Roofing Program (NRP) Design/Build 63rd
Post-Bid

HPD Northeast Police Station - HVAC and Roof Replacement
Results
$800,000 est. value
Houston, Sheldon, TX 77028

National Roofing Program (NRP) Design/Build Nationwide
Post-Bid

Fire Station 39 Roof Repairs
Results
Houston, TX

Field Service Center Roof Replacement
Post-Bid
Houston, TX 77029

South Campus S-8 Roof Replacement
Results
Less than $1,630,062 est. value
Houston, TX 77089

Aerial Roof Inspection Workshop
Post-Bid
TX 77002

Reported 07/10/2019 12:00 AM
Project Title

Lutheran Plaza Deck Re-Roofing

Physical Address View project details and contacts
City, State (County) Houston, TX   (Harris County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Re-roof the Lutheran upper and lower roofs (approximately 291,214 sq. ft.) with consideration of a green roof application at the Plaza Deck level to enhance the environment of care and the use of modified bitumen system on the upper roofs. This scope of work includes the third, fourth, fourteenth, fifteenth, sixteenth, and seventeenth roof levels of Lutheran. Address ongoing moisture intrusion issues by installing through-wall flashing at the base of the Lutheran Pavilion where it meets the Plaza Deck. Install safety guard rail systems meeting OSHA regulations. Install tiebacks on all upper roofs to facilitate the use of stages for window washing. Install fully compliant access ladders to the upper levels. Coat all exposed surfaces with white acrylic elastromeric fluid membrane. Install dedicated water service and electrical access to support swingstage operations and roofing maintenance.
Details
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents