Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

RR-21-4821 Pavement Repairs
Infrastructure
Results

2022 Cuba Road District - II
Infrastructure
Results
$188,963 CJ est. value
Cuba, IL 61427

Site Drainage Work at Eastview Elementary School
Infrastructure
Post-Bid
$177,000 est. value
Canton, IL 61520

Red Ember Remedial Reclamation
Infrastructure
Results
$300,000 est. value
IL

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Spray Patching
Infrastructure
Results
$56,269 CJ est. value
Canton, IL 61520

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Agricultural Management, Agricultural Fieldside Mowing, And Fence Installation and Repair At Fulton County, Illinois
Infrastructure
Results
$330,072 CJ est. value
Cuba, IL 61427

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Post-Bid
Schaumburg, IL 60194

Astoria Sanitary Sewer Rehabilitaion
Infrastructure
Results
$99,790 CJ est. value
Astoria, IL 61501

RFQ - Various Phase II Traffic Signal Coordination and Timing (SCAT) Projects, Various Routes
Term Contract
Post-Bid
$300,000 CJ est. value
Springfield, IL 62703

Seal Coating of Roads and Patching of Pavement at the Prairie Plan Site
Infrastructure
Results
$51,426 CJ est. value
Lewistown, IL 61542

Salt and Gravel Storage Structure
New Construction, Infrastructure
Post-Bid
$50,000 CJ est. value
Vermont, IL 61484

Last Updated 05/03/2023 09:32 AM
Project Title

Headwall Removal and Replacement

Physical Address View project details and contacts
City, State (County) Avon, IL 61415   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $938,577 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Headwall removal and replacement, culvert ext., and slope repair at 3 locations along IL 41 from S of Avon to N of Capp Rd. Region 2 District 2 Federal Project # County(s) Fulton Key Route(s) FAP 574 Marked Route(s) IL 41 Section(s) (12)CLV,SLP State Job #(s) C-94-090-18 PPS #(s) 4-02919-0300 VBP% 0.00 Completion Date: November 30, 2023 Plus 15 Working Days Questions not accepted as of April 18, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 123 - Headwall Removal and Replacement

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents