Similar Projects
Oak Trace Senior Living Community Phase II
New Construction
Conception
Downers Grove, IL

Community Center Memorial Room AV and Stage Lighting Replacement Project
Infrastructure, Renovation
Design
$800,000 CJ est. value
Wheaton, IL 60189

New Infrared Heating Systems in Three (3) Hangars
Renovation
Sub-Bidding
$159,281 CJ est. value
West Chicago, IL 60185

Replacing Five (5) Roof Top Mounted HVAC Units at Fire Station
Renovation
Sub-Bidding
$300,000 CJ est. value
Wood Dale, IL 60191

HVAC System Startup and Preventative Maintenance 2021-2023
Term Contract
Post-Bid
Elmhurst, IL 60126

HVAC and Mechanical Products
Term Contract
Post-Bid

Mechanical Upgrades - Summer 2021 Pierce Downer Elementary School
Results
Downers Grove, IL 60515

HVAC Ionization Renovations
Results
Bensenville, IL

Pure Hockey
New Construction, Build-Out - 7,886 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Elmhurst, IL 60126

Petkus Property Apartments
New Construction - 4,630 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Valley View, IL 60174

Mechanical Improvements at Multiple Sites
Renovation
Sub-Bidding
$400,000 CJ est. value
Bloomingdale, IL 60108

Lisle Police Department Exhuast Fan Replacement
Post-Bid
Lisle, IL

95th Street Community Plaza Phase II Development
Results
Naperville, IL

Two Replacement A/C Rooftop Units
Renovation
Post-Bid
Naperville, IL 60540

Carol Stream Building Automation Upgrade
Results
Glen Ellyn, IL

Last Updated 08/04/2022 01:36 PM
Project Title

Glendale Heights Civic Center RTU Replacement

Physical Address View project details and contacts
City, State (County) Glendale Heights, IL 60137   (DuPage County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Clubhouse/Social Club, HVAC
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $99,750 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The bond must be with a bonding company acceptable to the Village of Glendale Heights. Failure to furnish a satisfactory performance and payment bond within the period specified shall be cause for rejection of the bid. The Bidder shall certify that it has and will comply with all laws relating to the payment of general prevailing wages in accordance with the Illinois Prevailing Wage Act Bids shall only be withdrawn with written consent of the President and Board of Trustees of Glendale Heights. The Village of Glendale Heights reserves the right to reject any or all bids and to waive any informality in the bidding. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents