Similar Projects
Eastern Region Safety Improvements - Install Rumble Strip
Infrastructure
Design
$428,000 CJ est. value
Lind, WA 99341

I-90 / Ritzville to Tokio - Paving
Infrastructure
Design
$20,990,000 CJ est. value
Ritzville, WA 99169

SR 17 ET AL, NCR Seal 2022
Infrastructure
Post-Bid
$4,000,000 to $5,000,000 est. value

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

US 2 et al, NCR Bridge Patching 21-23
New Construction, Infrastructure
Results
$2,000,000 to $2,500,000 est. value

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

2022 Eastern Region Chip Seal - South
Infrastructure
Results
$7,000,000 to $10,000,000 est. value

ER Bridge Preventative Preservation - Patching
Renovation, Infrastructure
Results
$2,000,000 to $2,500,000 est. value

I-90, Bridge Deck Preventative Preservation - Patching
Renovation, Infrastructure
Results
$1,500,000 to $2,000,000 est. value

Ls Resurfacing 1
Term Contract
Results
$997,219,550 est. value

Booker Road Overlay 2 Project
Infrastructure
Results
$700,000 est. value
Ritzville, WA

2023 Eastern Region Chip Seal - North
Infrastructure
Results
$16,597,000 CJ est. value
Pizarro, WA 99169

Last Updated 12/23/2022 02:02 AM
Project Title

US 395/Old Maid Coulee Bridge SB Deck Rehabilitation

Physical Address View project details and contacts
City, State (County) Ritzville, WA 99169   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $773,269 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Hydro-milling, applying two inches of modified concrete overlay and replacing the compression seal and portions of the concrete header on bridge 395/115W, traffic control and other work. 30 working days. Estimated value $1,000,000 - $1,250,000 WSDOT - US 395/Old Maid Coulee Bridge SB - Deck Rehabilitation *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents