Last Updated 11/12/2021 11:21 PM
Project Title

Spooner - Stone Lake, Crystal Brook Bridge, B-65-0060; Spooner - Stone Lake, USH 53 to South Junction CTH M

Physical Address View project details and contacts
City, State (County) Spooner, WI   (Washburn County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation, Base, Concrete Pavement, HMA Pavement, Asphaltic Surface, Curb and Gutter, Signs, Beam Guard, Pavement Marking, and Bridge Replacement. Excavation Common, 8,780 CY; Backfill Structure, 772 Ton; Base Aggregate Dense, 5,237 Ton; Concrete Pavement, 168 SY; Concrete Masonry Bridges, 516 CY; Prestressed Girders, 420 LF 54-Inch; Bar Steel Reinforcement, 8,460 Lbs; Bar Steel Reinforcement Coated, 58,050 Lbs; Piling CIP Concrete, 2,850 LF 10 3/4-Inch; Marking Epoxy, 34,270 LF; Marking Paint, 179,300 LF; Construction Staking, 36,352 LF; Construction Staking, 3 Each; Construction Staking, 3 LS; Culvert Pipe, 182 LF 24”, 94 LF 30“, 75 LF 12“; Concrete Curb and Gutter, 56 LF; Beam Guard, 421 LF; Beam Guard Energy Absorbing Terminals, 4 Each; Asphaltic Surface, 300 Ton; HMA Pavement, 17,936 Ton; Removing Asphaltic Surface Milling, 2,816 SY; Tack Coat, 13,648 Gals; Signs, 417 SF.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents