Similar Projects
Norarrow Multifamily Housing
New Construction, Infrastructure - 270,880 SF
Conception
$80,000,000 CJ est. value
Fort Wayne, IN 46845

Norarrow Multifamily Housing
New Construction, Infrastructure - 270,880 SF
Conception
$80,000,000 CJ est. value
Fort Wayne, IN 46845

Tiburon/Livingston Lakes Extended
New Construction, Infrastructure
Design
Fort Wayne, IN 46818

Hunters Development
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fort Wayne, IN 46845

High Strength Waste Storage Improvements - Phase III
Renovation, Infrastructure
Bidding
$605,000 CJ est. value
Fort Wayne, IN 46802

2021 Pavement and Site Improvements
Infrastructure
Post-Bid
Fort Wayne, IN

2021 Pavement and Site Improvements
Infrastructure
Post-Bid
Fort Wayne, IN

Demolition and Lot Restoration for Neighborhood Code
Infrastructure
Results
Fort Wayne, IN

2021 HMA Resur­face Package 1
Infrastructure
Results
Fort Wayne, IN

RFP Design Architectural and Engineering Services for the Expansion and Renovation of Levan R. Scott Academy
Addition, Renovation, Infrastructure
Pending Verification
$670,000 CJ est. value
Fort Wayne, IN 46806

Isabelle Gardens
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Fort Wayne, IN 46805

Shift or Reconfigure Existing Taxiway - Fort Wayne Allen County Airport Authority
Infrastructure
Conception
$895,148 est. value
Fort Wayne, IN 46825

Premier Riverfront Property
New Construction, Infrastructure - 60,000 SF
Design
$70,000,000 CJ est. value
Fort Wayne, IN 46802

Concrete Pavement Restoration and Replace Superstructure
Infrastructure
Post-Bid
Bloomington, IN 47404

Community Cross­ings HMA Resurface 2021
Infrastructure
Results
Fort Wayne, IN

Last Updated 02/22/2023 05:49 PM
Project Title

Build, Learn, Grown ADA Improvements

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46802   (Allen County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $462,530 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 3, 2023, the project has been awarded. A timeline for construction has not been confirmed. Build, Learn, Grown ADA Improvements. Each bid shall be accompanied by a certified check, a cashier's check or a bid bond executed by a surety company which is authorized to do business in the State of Indiana, made payable to the Fort Wayne Community Schools and in an amount equal to five percent (5%) of the bid. In the event a bidder withdraws its bid or fails to execute a satisfactory contract within 10 days after the contract is awarded to such bidder by Fort Wayne Community Schools, Fort Wayne Community Schools may declare the certified check, cashier's check or bid bond forfeited to Fort Wayne Community Schools, as liquidated damages. A bid may not be modified, withdrawn, or cancelled by the bidder for sixty (60) days following the time and date designated for the receipt of bids without the consent of Fort Wayne Community Schools. Fort Wayne Community Schools reserves the right to reject any and all bids or waive any or all informalities, irregularities and/or inconsistencies in, or with respect to, any or all bids. Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the contract amount shall be required to be provided by the successful bidder to Fort Wayne Community Schools or its assignee no later than ten (10) days after the execution of such contract. Such bonds shall remain in full force and effect for a period of twelve (12) months after the date of Substantial Completion. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents