Similar Projects
Last Updated | 12/05/2019 03:38 PM |
Project Title | Salt Lake City (SLC) Cooling Tower Mechanical Separator |
Physical Address | View project details and contacts |
City, State (County) | Salt Lake City, UT (Salt Lake County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $25,000 to $50,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work of Project is defined by the Contract Documents and consists of the following: B. This project will augment the current water filtration system for the two (2) cooling towers at the Salt Lake City, UT Air Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON). This will be done by installing a mechanical system to separate particulates from the water. Work includes but is not limited to: installing a mechanical separator, revising the existing piping, and electrical power circuits. The current cooling system provides 135 tons of cooling with a water flow rate of 400 GPM and 95 ft. of head. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |