Similar Projects
New Consolidated Primary School
New Construction
Conception
Keyser, WV

Meadows Elementary School Construction
New Construction
Conception
Huntington, WV

Shepherdstown Elementary School Construction
New Construction
Design
Shepherdstown, WV

Ranson Elementary Construction
New Construction
Design
Ranson, WV

Additions and Renovations to Richwood Middle School, Richwood High School, and Cherry River Elementary School
Renovation, Addition
Bidding
Richwood, WV 26261

Gilmore Elementary School Wastewater Treatment Plant Replacement
Renovation
Bidding
Sandyville, WV 25275

New Stratton Elementary School
New Construction - 58,785 SF
Post-Bid
Beckley, WV 25801

Storage Buildings
New Construction
Post-Bid
New Cumberland, Weirton, WV 26047

Washington Lands Elementary School Safe School Renovations
Renovation
Results
Moundsville, WV 26041

Safe School Entrance Renovations for Geary and Walton Elementary and Middle School
Renovation
Results
$618,000 est. value
Left Hand, WV 25251

Orchard View Intermediate School Classroom Addition
Addition - 9,156 SF
Construction
Martinsburg, WV 25403

2018 Bond Work - Bid Package 4
Construction
$16,989,500 est. value
Wheeling, WV 26003

2022 Bond Construction & Renovation Projects
New Construction, Renovation
Pending Verification
Martinsburg, WV

Davis Creek Elementary School Construction
New Construction
Conception
Huntington, WV

Blennerhassett Elementary School Renovations
Renovation
Design
Parkersburg, WV 26101

Reported 02/16/2022 12:00 AM
Project Title

Cottageville Elementary School Renovations

Physical Address View project details and contacts
City, State (County) Cottageville, WV 25239   (Jackson County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Selective Interior Renovation to include the following: a. Selective demolition. b. Remedial in-fill construction of exterior masonry walls where indicated. c. Alterations to bituminous membrane roof. d. New aluminum storefront framing and glazing. e. Hollow metal doors and frames. f. New interior room finishes including suspended acoustical panel ceiling. g. Interior Signage. h. Plumbing, HVAC, and Electrical system alterations. 2. Site work and Site improvements including, but not limited to, the following: a. Site Utilities. b. Paved driveways and parking areas. c. Signage. d. Landscaping. This project is funded in part by the Elementary and Secondary School Emergency Relief Fund (ESSER) as follows: 1. ESSER-funded work: a. All demolition of ceilings and new ceilings in the following rooms: Corridors 115, 132, and 133; Classrooms 105, 106, 112, 121-130; Media Center 108; and Kitchen 110. b. All demolition of windows, storefront systems, and exterior doors, and new storefront and aluminum entrances. c. Hazardous material abatement at ceilings. d. All demo and new work in Utility Entrance 114 not specifically mentioned elsewhere. e. All roof demo associated with new and/or existing mechanical equipment. f. Exterior division 04 work. g. New flooring and base in areas where hazardous materials were abated. h. All mechanical work (divisions 20-25). i. All electrical (division 26) work associated with new mechanical work and the new electrical service. 2. Balance of work locally-funded: a. All work associated with new roof hatch and new roof ladder(s) including associated demolition. b. All demolition of ceilings and new ceilings in rooms not listed in ESSER-funded items. c. All hazardous materials abatement other than that listed as part of ESSR-funded work. d. New window shades. e. All demolition of walls, doors, and construction of new walls and doors in rooms Work 104, Speech 105 and 106, Gym Storage 107A, Fire Service 107B, Future walk-ins 111B, and Pre-K 112. f. Interior division 04 work. g. All interior doors and hardware. h. All flooring and base not listed above. i. All division 10 work. j. All fire suppression work including work outside the building. k. All other electrical (division 26) work including lighting. l. New fire alarm system. m. All division 28. n. Any other work not mentioned in ESSER funded list.

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents