Similar Projects
2020 Wastewater Treatment Plant Improvements (0.75 MGD)
New Construction
Bidding
$1,238,000 est. value
Richmond, TX 77406

Water Plant and Wastewater Treatment Plant MCC Replacement
New Construction
Bidding
$1,100,000 est. value
Sugar Land, TX 77498

Mustang Bayou Wastewater Treatment Plant Expansion and Rehabilitation Project
Post-Bid
$6,700,000 est. value
Missouri City, TX 77545

Deer Run Meadows 0.075 MGD Wastewater Treatment Plant
New Construction
Post-Bid
Richmond, TX 77406

Capital Improvement Program Multiple Projects
Addition
Results
Sugar Land, TX

Waste Water Treatment Plant Expansion to 0.99 MGD
Results
Katy, TX 77493

Wastewater Treatment Plant - Phase 4 (.90) MGD and Lift Station No. 7
New Construction
Bidding
TX

Wastewater Treatment Plant Rehabilitation and Lift Station Conversion
Post-Bid
$1,365,000 est. value
Katy, TX 77449

Wastewater Treatment Plant Expansion to 0.99 MGD
Results
Katy, TX 77493

Refurbishment of Elevated Splitter Box at Wastewater Treatment Plant No. 1 Serving
Post-Bid
TX

Wastewater Treatment Plant Phase 1
Results
Less than $2,139,671 est. value
TX

1.20 MGD Wastewater Treatment Plant Effluent Modifications
Post-Bid
TX

Wastewater Treatment Plant Expansion to 1.2 MGD
Results
Less than $30,500,000 est. value
Richmond, TX 77406

Wastewater Treatment Plant Rehabilitation
Results
$578,300 est. value
TX

Wastewater Treatment Plant Package Plant Rehabilitation
Results
Richmond, TX 77469

Last Updated 05/21/2021 12:56 PM
Project Title

Mustang Bayou Wastewater Treatment Plant Expansion and Rehabilitation Project - BOP

Physical Address View project details and contacts
City, State (County) Missouri City, TX 77489   (Fort Bend County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,000,000 to $8,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of two design packages: Early Work Package (EWP-1) and Balance of Plant (BOP). EWP-1 has been completed and BOP is the construction phase. Mustang Bayou WWTP Items 1. Mobilization/ Demobilization 2. The BOP Package will consist of Tank modifications, Yard Piping installation and modifications, New Chemical area, New Headworks Structure, Rehabilitation to the Existing Lift Station, Two New Splitter Boxes, and Modifying four Aeration Basins into four Clarifier Contact Basins, Moving two existing clarifiers and connecting with the package plant, Concrete pads at various locations. 3. The Electrical package consists of new switchgear, installation of a surplus generator, site duct bank and exposed conduit to complete a working package.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents