Similar Projects
Pequea Boulevard Resurface
Infrastructure
Conception
$2,449,000 CJ est. value
Pequea, PA 17565

North Churchtown Rd Bridge
Infrastructure, Renovation
Conception
$350,000 CJ est. value
East Earl, PA 17519

Greenville Road Bridge-B
Demolition, New Construction, Infrastructure
Design
$2,237,098 CJ est. value
Reinholds, PA 17569

Lincoln Hwy Bridge # 3
Infrastructure, Renovation
Design
$1,698,525 CJ est. value
Kinzers, PA 17535

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Fruitville Pike Improvement Project
Infrastructure
Post-Bid
Lancaster, PA 17573

Water Main Replacement Project
Infrastructure
Post-Bid
Lancaster, PA

Maytown Fire Department Parking Lot
Results
Marietta, PA

2021 Sidewalk, Curb and Handicap Ramp Installation and/or Replacement
Results
Mount Joy, PA 17552

Meadia Heights Golf Course Pool and Restaurant
New Construction, Renovation - 1,800 SF
Construction
Lampeter, PA 17537

Brent L Miller Jewelers
Infrastructure
Construction
Lancaster, PA 17601

Garden Spot Village / Ranck Road
New Construction, Infrastructure - 68,000 SF
Pending Verification
$8,500,000 CJ est. value
New Holland, PA 17557

Garden Spot Village / Ranck Road
New Construction, Infrastructure - 68,000 SF
Pending Verification
$8,500,000 CJ est. value
New Holland, PA 17557

Main St Curb and Sidewalk
Infrastructure
Conception
$1,069,810 CJ est. value
Bird in Hand, PA 17505

PA 72 over Chiques Creek
Demolition, New Construction, Infrastructure
Design
$654,300 CJ est. value
Rapho Township, PA 17545

Last Updated 12/05/2022 10:35 AM
Project Title

Miller Road Sewage Pumping Station Expansion - Contract No. 4 - Force Main

Physical Address View project details and contacts
City, State (County) Elizabethtown, PA 17022   (Lancaster County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,071,083 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 5, 2022, outfall line construction has started, however, the station itself has not due to supply issues. In general, the work consists of, but is not limited to, furnishing all labor, materials, equipment and incidentals required for the expansion of the existing 800 gallon-per-minute (gpm) buried, packaged pumping station to a 1735 gpm submersible sewage pumping station and install approximately 9,300 LF of 12" force main in parallel to the existing 10" force main. Work includes the installation of three (3) submersible sewage pumps, piping and appurtenances, control system, variable speed pump motor controllers, new channel grinder, a 12-ft x 12-ft precast wet well, precast concrete valve vault and meter pit, temporary electrical connections, a new electrical service entrance, construction of a 22' x 23' masonry building to house electrical gear and a 250 kw emergency generator, HVAC equipment, precast manhole structures and yard piping, site paving, fencing, and grading; demolition of all existing pumping station facilities, and the maintenance of sanitary sewer flows. Four contracts will be issued for the project: General, Electrical, HVAC, and Force Main. CLARIFICATION DEADLINE 4/8/2022 11:00 AM BID TYPE Fixed Fee Contract Contract No. 4 - Force Main Location: The project site is located in West Donegal Township, Lancaster County, Pennsylvania, within and along the roadways of Miller Road, Bainbridge Road (S.R. 2001), and Amosite Road from the existing Miller Road pumping station to the Elizabethtown Sewage Treatment Plant. Description of Work: In general, the work consists of, but is not limited to, furnishing all labor, materials, equipment and incidentals required to construct a 12-inch diameter force main in parallel to the existing 10-inch sewage force main. Work will include tying the existing force main in with the proposed 12-inch line; polyethylene wrapping as necessary to provide external corrosion resistance of the force main; excavation and steel casing as it pertains to the placement of the 12-inch force main; installation of air release valves and vaults; site restoration; testing of the new 12-inch force main, and the maintenance of sanitary sewer flows. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents