Similar Projects
Guest House on Garrett / 521 Bryan
New Construction, Infrastructure - 39,870 SF
Design
$3,283,000 CJ est. value
Dallas, TX 75201

Everest Stone Showroom and Warehouse
New Construction, Infrastructure - 7,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX 75229

Wraparound Services Center
New Construction, Infrastructure - 11,000 SF
Bidding
$4,600,000 CJ est. value
Dallas, TX 75252

Mckinney Municipal Complex
New Construction, Infrastructure - 173,000 SF
Post-Bid
$95,000,000 CJ est. value
McKinney, TX 75069

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Trinity Forest Spine Trail Phase 1 - Site Development
Results
Dallas, TX

Construction of Stonebridge Lift Station Phase I Improvements
New Construction
Results
$835,000 est. value
McKinney, TX

Popeyes / McKinney
New Construction, Infrastructure - 2,700 SF
Construction
$725,000 CJ est. value
McKinney, TX 75070

DMD Acura Plano
New Construction, Infrastructure - 60,090 SF
Construction
$15,250,000 CJ est. value
Plano, TX 75093

Lone Star Medical Center - Building Two
New Construction, Infrastructure - 15,430 SF
Pending Verification
$2,000,000 CJ est. value
Allen, TX 75013

Spring Creek Parkway Mixed-Use Development / Plano
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Plano, TX 75074

Bonton Farms Wellness Center
New Construction, Infrastructure - 4,700 SF
Design
$5,500,000 CJ est. value
Dallas, TX 75215

Utility Improvements for Inspiration, Phase 8B
Infrastructure
Post-Bid
TX

Advanced Metering Infrastructure System
Results
Allen, TX

K Avenue Lofts
New Construction, Infrastructure
Construction
$88,434,704 CJ est. value
Plano, TX 75074

Last Updated 11/01/2022 06:32 PM
Project Title

Celina Legacy Hills Water Reclamation Facility Improvements

Physical Address View project details and contacts
City, State (County) Celina, TX 75009   (Collin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $33,002,795 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

City of Celina's Legacy Hills Water Reclamation Facility Phase 1 Improvements include an influent pumping facility, influent flow metering facilities, headworks facility including influent screening with screenings transport and processing facilities together with grit removal with grit pumping and grit processing facilities, sequential batch reactor (SBR) facilities with SBR aeration blower facilities and post equalization with flow control station. Tertiary filtration facilities together with pumped backwashing facilities, are followed by ultraviolet disinfection facilities with an effluent metering facility. A non-potable water pump station and liquid hypochlorite handling and metering system are provided. An electrical distribution with adjoining office/laboratory facilities is provided together with a standby power generator unit. An effluent pipeline transports the treated flow to an outfall discharge structure located on an unnamed tributary of the Little Elm Creek. A waste activated sludge (WAS) pump station directs waste solids to sludge holding tanks, that is complete with aeration blowers. Sludge transfer pumps direct solids from the sludge holding tanks to a sludge dewatering facility that uses belt press technology to dewater the solids. Dewatered solids are transported to an enclosed temporary sludge holding bin. The bin is then hauled offsite for emptying and final sludge disposal. The project includes an associated array of piping enhancements, site development enhancements, drainage improvements and civil/yard enhancements, install power supply from electric utility, interconnect with City's potable water network, together with electrical, instrumentation, and control enhancements to develop a complete and functional facility capable of treating 0.95 MGD permitted design flow. The successful prequalified bidder must furnish performance, payment and maintenance bonds each in the amount of 100 percent of the contract price from an approved Surety Company holding a permit from the State of Texas, to act as Surety and be acceptable according to the latest list of companies holding certificates of authority from the Secretary of Treasury of the United States, or other Surety or Sureties acceptable to the Owner. The Owner reserves the right to reject any or all bids and to waive formalities. In case of ambiguity or lack of clearness in stating the price in the bids, the Owner reserves the right to consider the most advantageous construction thereof, or to reject the bid. Unreasonable or unbalanced unit prices will be considered sufficient cause of rejection of any bid or bids City of Celina has adopted prevailing wage rates for Collin County and uses the most current listing. Bidders are expected to inspect the site of the work and to inform themselves regarding conditions under which the work is to be done. Owner anticipates that the Project's total bid price will be approximately $30,000,000. The Project has an expected duration of 540 calendar days.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents