Last Updated | 05/23/2023 02:06 AM |
Project Title | Park Office HVAC Upgrades and Interior Renovations Point au Roche State Park |
Physical Address | View project details and contacts |
City, State (County) | Plattsburgh, NY 12901 (Clinton County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $291,858 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Sealed bids for Park Office HVAC Upgrades and Interior Renovations at Point au Roche State Park, Town of Plattsburgh, Clinton County, New York Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by Bid Security in the form of a certified check, bank check, or bid bond in the amount of $10,000.00, Ten Thousand Dollars and 00/100. Project consists of all labor, materials and equipment necessary for replacing the existing suspended acoustical panel ceiling system, electrical fixtures, and network cabling with a new drywall ceiling system, new CAT6 network cabling adding 6 new network connections, and new light fixtures. Also installing a new cold-climate air-source heat pump system. Estimate Range: $146,245 - $197,862 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The following goals for MWBE participation on this project have been established at: Minority Owned Business Enterprise (MBE) 18% Women Owned Business Enterprise (WBE) 1% SERVICE-DISABLED VETERAN OWNED BUSINESS (SDVOB) GOALS The following goals for SDVOB participation on this project have been established at: Service-Disabled Veteran Owned Business 4% * This project was not awarded and will be advertised for re-bid in a couple of weeks. There will be a new contract number.* The successful bidder will be required to furnish a Performance Bond and a Labor and Material Bond/Payment Bond in the statutory form of public bonds required by Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract. All Requests for Information (RFIs) are due by: 1:30 p.m. on Tuesday, Nov. 29, 2022 RFIs received after this due date and time will not be processed. Estimate Range: $146,245 - $197,862 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Contacts: David Green David.Green@parks.ny.gov, 607-387-7041 Lynda Shute Lynda.Shute@parks.ny.gov, 315-479-3257 All Requests For Information (RFIs) are due by: 1:30 p.m. on Wed. May 2, 2023 Director's Representative will return without response those RFIs submitted to Director's Representative by other entities controlled by Contractor. Estimate: $208,244 - $281,742 the following: 1. Work includes provision of new ceilings, lighting systems, data ports and wiring, coldclimate air-source heat pump system, heat recovery ventilation system, and miscellaneous associated work. B. Prior to commencement of construction, the Park staff will have moved all furniture and electronic technology out of the work area. Items to remain in place include but are not limited to the following: kitchen cabinetry, kitchen appliances and bathroom fixtures. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |