Similar Projects
Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Construct Event and Conference Center - Murray State University
New Construction, Infrastructure
Conception
$8,198,000 CJ est. value
Murray, KY 42071

Langley Bullock Industrial Development / Hebron
New Construction, Infrastructure - 230,000 SF
Design
$123,510,000 CJ est. value
Hebron, KY 41048

Welding Alloys Storage Building
New Construction, Infrastructure - 16,000 SF
Design
$1,700,000 CJ est. value
Florence, KY 41042

Asphalt Resurfacing - US-127
Infrastructure
Bidding
$1,583,119 CJ est. value
Danville, KY 40422

New City of Florence Fire Station 4
New Construction, Infrastructure
Bidding
$9,250,000 CJ est. value
Florence, KY 41042

Contract Paving on Various Roads
Infrastructure
Post-Bid
$300,000 CJ est. value
Brooksville, KY 41004

Pavement Markers and Reflectors
Infrastructure
Post-Bid
$600,000 CJ est. value
Richmond, KY 40475

Action for Eastern Montana Glasgow Head Start Facility
Infrastructure
Results
$380,573 CJ est. value
Glasgow, KY 42141

Weaver Road (KY 842) Sidewalk
Infrastructure
Results
$1,947,464 CJ est. value
Florence, KY 41042

Union Promenade
New Construction, Infrastructure - 155,000 SF
Construction
$150,000,000 CJ est. value
Union, KY 41091

Florence Apartments
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Florence, KY 41042

Renaissance on Broadway / Louisville
New Construction, Infrastructure - 20,000 SF
Pending Verification
$20,000,000 CJ est. value
Louisville, KY 40211

UofL Health Medical Center South
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Shepherdsville, KY 40165

Address Pavement Condition of Louie B. Nunn Cumberland Parkway
Infrastructure
Conception
$4,400,000 CJ est. value
Glasgow, KY 42141

Last Updated 07/18/2023 10:03 AM
Project Title

Jerry Riley WWTP - Lagoon 2 Liner Replacement

Physical Address View project details and contacts
City, State (County) Bardstown, KY 40004   (Nelson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the removal and replacement of approximately 222,000 square feet of f-RPP geomembrane lagoon liner after the City has had the sludge removed from the lagoon under separate contract. There is also approximately 99,000 square feet of compacted borrow soil liner to be place on the "floor" of the lagoon as well as a non-woven geotextile material between the additional soil liner and the geomembrane liner. The borrow soil material is available on-site. The project is being done with local funds only, and wage rates will not apply. Project estimate is from $600,000 to $800,000* *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Sewage Treatment Plant, Approximately 222,000 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents