Similar Projects
Urgent Plumbing Services
Term Contract
Bidding
Santa Ana, CA 92701

Contractor - Lower Weyand Pipeline Project
Alteration
Bidding
$200,000 est. value
Vacaville, CA

Levi's Stadium Plumbing Reducing Valves Project
Alteration
Sub-Bidding
$200,000 est. value
Santa Clara, CA 95054

Modular Classroom Restroom Addition At Haynes Elementary School
Renovation
Post-Bid
Ontario, CA 91762

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

Plumbing Services
Term Contract
Results
$200,000 est. value
San Jose, CA 95128

Plumbing Contractor
Term Contract
Results
Concord, CA

Job Order Contract (JOC) for Plumbing Services
Alteration
Bidding
Santa Ana, CA

Plumbing Services BPA
Term Contract, Alteration
Post-Bid
Edwards, CA

District Wide HVAC Replacements 11 Campuses (COVID) - Plumbing
Alteration
Results
$1,000,000 est. value
Hesperia, CA 92344

CalSHAPE Program Plumbing Fixture Installation
Alteration
Bidding
$15,000 est. value
Arcata, CA 95521

"As Needed" Plumbing Services
Term Contract
Post-Bid
Eureka, CA 95501

Orchard Dale Elementary School Modernization Project- Plumbing
Alteration
Results
Whittier, CA 90603

On-Call Plumbing Services
Alteration
Bidding
Blackhawk, CA

Plumbing Contractor Services
Term Contract
Post-Bid
Concord, CA

Reported 07/01/2022 12:00 AM
Project Title

RFQ Contractor - Hubbs Hall Plumbing and Slab Repairs - Plumbing Contractor

Physical Address View project details and contacts
City, State (County) San Diego, CA   (San Diego County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $3,800,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The primary objective of the Hubbs Hall Plumbing and Slab Repairs Project is to address the major plumbing failures and structural voids within the building. Structural stabilization to be accomplished via pressure grouting the existing voids under the existing slab, which is approximately 4,000 square feet. Existing finishes will be restored to the existing preconstruction conditions, which includes walls, base boards, flooring, and painting where necessary. Existing equipment, fixtures and lab benches will be avoided to prevent major destruction to permanent items. Remove/abandon existing sewer waste, seawater drains and acid waste piping where it has been impaired. Re-route or replace where necessary. Remove and reinstall existing casework as needed to perform piping reroutes. The existing west storm drain piping will be abandoned and re-routed, while also replacing the West roofing systems. The addition of roof gutters at all the west overhangs will accommodate the overhang run off.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents