Similar Projects
Building 302 Major Equipment Replacement
Term Contract, Alteration
Design
$5,000,000 to $10,000,000 est. value
Gaithersburg, MD 20899

Building 302 Major Equipment Replacement
Term Contract, Alteration
Design
$5,000,000 to $10,000,000 est. value
Gaithersburg, MD 20899

NIF 4.7T Electronics Room Air Handler & Chilled Water Coil Replacement
Post-Bid
Bethesda, MD 20814

Filters, Air and HVAC
Term Contract
Post-Bid
Gaithersburg, Rockville, MD 20879

Arc Melter with Chilled Water Vacuum Suction Casting
Results
Gaithersburg, MD

NIST Center for Neutron Research Cooling Tower Maintenance and Repair Services
Results
Gaithersburg, MD

Gaithersburg Maintenance Facility
Term Contract
Post-Bid
Less than $50,000 est. value
Gaithersburg, MD 20878

Maintenance for NCNR Cooling Tower Rolling Doors
Results
Gaithersburg, MD

Repair of NIST HVAC Equipment and Pumps
Post-Bid
Gaithersburg, MD

HVAC and Mechanical Equipment Preventative Maintenance and Repair Olney Readiness Center
Term Contract
Results
Less than $50,000 est. value
Gaithersburg, MD 20882

Pool Pak, Dectron, Libert, Miscellaneous HVAC Repair And Other Services
Post-Bid
Rockville, MD

Water Heater Replacement
Results
Salisbury, MD

Galvanized Pipe Replacement (RGH)
Post-Bid
Laurel, MD 20707

HVAC and Mechanical Equipment Preventative Maintenance and Repair Laurel Readiness Center and FMS
Term Contract
Results
Less than $50,000 est. value
Laurel, MD 20708

Dust Collector
Post-Bid
Gaithersburg, MD 20899

Reported 03/24/2022 12:00 AM
Project Title

Helium Compressor - Outdoor Unit

Physical Address View project details and contacts
City, State (County) Silver Spring, MD 20903   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Shipping, handling, in-side delivery, installation and verification later than 120 calendar days after receipt of contract award for the Helium Compressor – Outdoor Unit.

Details

Division 01 - General Requirements.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 40 - Process Integration, Inert Gases Process Piping, Helium Process Piping.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents