Similar Projects
Caseys General Store / Evansville
New Construction, Infrastructure
Conception
$1,350,000 CJ est. value
Evansville, IN 47708

Site Plan - South Weinbach Avenue & Lincoln Avenue / Mixed Use - University of Evansville
New Construction, Infrastructure - 3,500 SF
Design
$959,000 CJ est. value
Evansville, IN 47714

MJM Warehouse / Evansville
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Evansville, IN 47715

Pedestrian Bridge Construction
New Construction, Infrastructure
Bidding
$2,080,500 CJ est. value
Evansville, IN 47714

Pedestrian Bridge Construction
New Construction, Infrastructure
Bidding
$2,080,500 CJ est. value
Evansville, IN 47714

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

2022 Concrete and Asphalt Patching
Infrastructure
Results
Evansville, IN

Baker Flat / Evansville
New Construction, Infrastructure
Construction
$11,000,000 CJ est. value
Evansville, IN 47710

2022 Mill and Overlay - Phase II
Infrastructure
Construction
$1,097,983 CJ est. value
Evansville, IN 47708

Ohio River Crossing Projects - Kentucky Transportation Cabinet
Infrastructure
Pending Verification
$1,212,000,000 CJ est. value
Evansville, IN 47714

Ohio River Crossing Projects - Kentucky Transportation Cabinet
Infrastructure
Pending Verification
$1,212,000,000 CJ est. value
Evansville, IN 47714

CenterPoint Energy Power Facility / Evansville
Addition, Demolition, Build-out, Infrastructure
Design
$2,000,000 CJ est. value
Evansville, IN 47714

Heartland Dental / Evansville
New Construction, Infrastructure - 4,248 SF
Bidding
$2,000,000 CJ est. value
Evansville, IN 47715

Last Updated 04/20/2023 06:33 AM
Project Title

Concrete Pavement Replacement and Drainage Repair Along I-69 in Vanderburgh, Gibson, and Warrick Counties

Physical Address View project details and contacts
City, State (County) Evansville, IN 47725   (Vanderburgh County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $13,458,792 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes concrete pavement replacement and drainage repair along I-69 in Vanderburgh, Gibson, and Warrick Counties. Estimated construction time is from April 2023 until December 2023. Receiving Waters: UNT 1 to Eagle Creek, UNT 2 to Eagle Creek, UNT to Kolb Ditch, UNT to Lockwood Ditch, UNT 1 to Bluegrass Creek, UNT 2 to Bluegrass Creek, and Wetlands 1-13. Des. Numbers: 2000889 (Lead) 2000692, 2000715, and 2000717. The method of contractor selection has not been determined at this time

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents